Laserfiche WebLink
<br />" <br /> <br />7. Controlling Weather Modification Operations (continued) <br /> <br />Following each seeding operation, each generator operator that <br /> <br /> <br />was instructed to run his nuclei generator will submit a written <br /> <br /> <br />report on the actual operations times, verify the seeding rates and <br /> <br /> <br />note any weather observations or operational discrepancies during <br /> <br /> <br />his requested operating period. A summary of these reports for each <br /> <br />seeding operation will be provided to the Department of Natural <br /> <br /> <br />Resources on a regular basis as required. <br /> <br /> <br />The generator network will be serviced primarily by trained <br /> <br />and experienced personnel with up to ten years of recent field <br /> <br />experience on weather modification programs. Additional help <br /> <br /> <br />as needed will assist these technicians in maintaining the availability <br /> <br /> <br />and proper operation of the generators in the network. Because <br /> <br />of their familiarity with the types of weather conditions considered <br /> <br /> <br />for seeding, the technicians' weather observations from the various <br /> <br />portions of the seeding areas provide additional information to the <br /> <br /> <br />meteorological personnel for continuous operational program control. <br /> <br />8. Describe how other weather modification projects (if any) could be <br />affected adversely by the proposed project: <br /> <br />There are no other weather modification projects known to the <br /> <br />applicant which will be adversely affected by this program. <br /> <br />25 <br />