My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PUB00134
CWCB
>
Publications
>
Backfile
>
PUB00134
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2010 3:55:22 PM
Creation date
9/30/2006 10:22:08 PM
Metadata
Fields
Template:
Publications
Year
1998
Title
Construction Fund Annual Report 1998
CWCB Section
Finance
Author
CWCB
Description
Construction Fund Annual Report 1998
Publications - Doc Type
CF Annual Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />SAl'OCHEZ DITCII & RESERVOIR CO - SA,'1CIIEZ DAM OUTLET REIIABILIT A nON <br /> <br /> <br />Looking Down Into the 135 foot High Outlet Tower <br /> <br />Proiect Description <br /> <br />1bis dam outlet rehabilitation project for the Sanchez Dam was designed by Smith <br />Geotechnical Engineers from Ft. Collins. The project included the replacement of the outlet <br />structures gates. valves and appurtenances in vel)' difficult underv.'ater construction conditions. <br />Construction commenced in February ) 997 by a special construction staff hired by the Sanchez <br />Ditch and Reservoir Company. The staff was hired in order to reduce project costs and take <br />advantage of specialized construction skills necessary for successful project completion. The <br />project was completed in late July 1997 with financial contract requirements completed in <br />September. <br /> <br />Proiect Data <br /> <br />Sponsor: Sanchez Ditch and Reservoir Co. CouoQ': Costilla <br /> <br />River: Ventero Creek <br /> <br />Term, of Loao: $335.000@3,75% for 25 yrs. <br /> <br />Substantial Completion Date: Sept. 3.1997 <br /> <br />Design Engineer: Smith Geotechnical Engineers. Inc. - Fe Collins. Colorado <br /> <br /> <br />Construction Contractor: Scott Holman and Associates - South fork. Colorado <br /> <br />Design Criteria: <br /> <br />3 - New 30 in. Hydraulic Knife Gate Valves <br />2 - Ne..." 48 in. Hydraulic Wedge Gate Valves <br />1 - New 48 in. Fixed Cone Valve <br />3 - Existing 30 in. Wedge Gates - Replace !\.1echanical Operators and Stems <br /> <br />Annual Volume o[""ater Delinred by the Project: 20,000 ac.ft. <br />
The URL can be used to link to this page
Your browser does not support the video tag.