My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PUB00134
CWCB
>
Publications
>
Backfile
>
PUB00134
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2010 3:55:22 PM
Creation date
9/30/2006 10:22:08 PM
Metadata
Fields
Template:
Publications
Year
1998
Title
Construction Fund Annual Report 1998
CWCB Section
Finance
Author
CWCB
Description
Construction Fund Annual Report 1998
Publications - Doc Type
CF Annual Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />5.0 Studies and Investigations <br /> <br />From time to time over the years. the Board has recommended, and the General Assembly has <br />approved. lhe use of the Construction Fund to support a numherofnon-reimbursabJe (grant) studies, <br />investigations. and projects. In FY 98. the Board recommended 7 non-reimbursable studies and <br />projects totaling 52.57 million. These gram recommendations. which were incorporated into HB <br />98-1189 and passed by the General Assembly, are listed in the table below. <br /> <br />TABLE 14 <br />Colorado '''ater Consen"ation Board <br />1998 Grant Recommendatiom <br /> <br />Grantee ~ Project Count)! Amount <br />eWeB and Stale Engineer. basinwide 2,000,000 <br />Rio Grande Decision Support Sy<;tem 031:1 CollectIon & Design <br />Stat<= Engineer- statewide 120,000 <br />Sale-line :\Ionitonng System ~1.L.:nance Continuation <br />Sl.:lte Engineer. basinwide 75,000 <br />Arkansas River Wc:1J Measurement Program Continuation <br />CWCB- Douglas 200,000 <br />Chatfic:1d Reservoir RealJoc:ttion Feasibility Study Increase <br />CWCB- basinwide 56,000 <br />South Plane River Multi-Objective Floodplain Management Plan Continuation <br />ewes- Routt 30.000 <br />lower Elk River Floodplain Management Pl:ln <br />Denver Museum of Natural HlstoryIU.S. GeologH:al Survey. Den'...erBasin 90,000 <br />Geo-Hydrolog.ic InvestigJtion of the Denver Basin Aquifers <br /> TOlal $2.571.000 <br /> <br />I <br />I <br />I <br /> <br />5.1 Rio Grande Decision Support Syslem Data Collection and Design <br /> <br />I <br /> <br />l 'eI" t::e guida~ce of a technic. . advisory committee (T AC), a feasibilit}, study for a Rio <br />Grande Decision Support System (RGDSS) was completed and presented to the Board at its January <br />1998 meeting. The project was estimated to cost up to 55.0 mil1ion over 3 years including S3.5 <br />million for data collection and S 1.5 million for design. Based upon the recommendation of the T AC, <br />the CWCB recommended an appropriation of up to 52.000,000 during FY98-99 to the Division of <br />\Vater Resources and the CWCB to collect data. manage the design of the system. develop the <br />necessary databases. models. and user tools, and to acquire, operate, and maintain the associated <br />hardware and software. The C\VCB and Di';sion of Water Resources \\;11 continue to rely upon the <br />T AC for ad\'ice. <br /> <br />I <br />I <br /> <br />cweB FY9S Annual Report. page 35 <br />
The URL can be used to link to this page
Your browser does not support the video tag.