My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PUB00129
CWCB
>
Publications
>
Backfile
>
PUB00129
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2010 3:55:22 PM
Creation date
9/30/2006 10:21:49 PM
Metadata
Fields
Template:
Publications
Year
1980
Title
Construction Fund Annual Report 1980
CWCB Section
Finance
Author
CWCB
Description
Construction Fund Annual Report 1980
Publications - Doc Type
CF Annual Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />/ <br />/ <br />/ <br /> <br />.~ <br /> <br />.~ <br /> <br />KELTON HEIGHTS v~\TER DISTRICT PROJECT, Continued <br /> <br />. <br /> <br />.. <br /> <br />existing system. <br /> <br />All existing users of the water system are currently <br /> <br />metered so no meter installation will be required on this project. <br /> <br />PROPOSED PROJECT <br /> <br />The project will be quite simple in nature. It involves replacing <br /> <br />existing two inch and four inch mains with six inch and eight inch <br /> <br />mains,respectively, plus installing some new fire hydrants. As the <br /> <br />Denver Water Department is the water supplying agency for the project, <br /> <br />the design plans and specifications must meet with that agency's <br /> <br />approval. <br /> <br />Specifically, the project involves installing ten thousand nine <br /> <br />hundred lineal feet of six inch and eight inch water mains, six new <br /> <br />fire hydrants, ten new six inch valves, three new eight inch valves <br /> <br />and connecting all existing service lines to the new mains. The total <br /> <br />estimated cost of the project, including engineering, administration, <br /> <br />inspection, contingencies, etc., is $453,000. <br /> <br />RECOHMENDATION <br /> <br />The water users in the Kelton Heights Water District are in <br /> <br />serious need of increased flo,,, in the distribution system during peak <br /> <br />day usage to provide adequate fire flow capability and to meet in-house <br /> <br />and irrigation demands. The project as described in the feasibility <br /> <br />study will solve all of these problems. <br /> <br />As stated in the study, the search for other sources of funding <br /> <br />. <br /> <br />-3- <br />
The URL can be used to link to this page
Your browser does not support the video tag.