My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PUB00128
CWCB
>
Publications
>
Backfile
>
PUB00128
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2010 8:58:18 AM
Creation date
9/30/2006 10:21:48 PM
Metadata
Fields
Template:
Publications
Year
1986
Title
Rio Grande Water Supply Study Phase I Plan of Study
CWCB Section
Interstate & Federal
Author
Leonard Rice Consulting Water Engineers, Inc.
Description
A plan submitted to the San Luis Valley Water Conservancy District by the CWCB
Publications - Doc Type
Tech Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Document <br /> <br />Draft Submittal <br /> <br />Review Time <br /> <br />Study Period Memorandum Feb. 2, 1987 <br />Task 1 Memorandum Mar. 16, 1987 <br />Task 2 and 4 Memorandum Feb. 16, 1987 <br />Task 3 Memorandum Mar. 2, 1987 <br />Task 5 Memorandum Mar. 23, 1987 <br />(Inc1udes recommendations for 2 potentia1 <br />Task 6 Memorandum Jun. 22, 1987 <br />Draft of Final Report Jul. 27, 1987 <br /> <br />2 Weeks <br />2 Weeks <br />2 ~Jeeks <br />2 Vleeks <br />2 Weeks <br />storage sites) <br />2 Vleeksc <br />2 Weeks <br /> <br />The following tentative dates have been established for formal <br />meetings with the CWCB, SLVWCD and USBR to review aspects of the <br />study progress, results to date and exchange of other pertinent <br />strategic, planning, technical, legal or seheduling information. <br /> <br />April 6, 1987 - <br /> <br />To review all work to date (including proposed <br />reservoir sites) and discuss approach to be <br />used in model ing. <br /> <br />July 6, 1987 - <br /> <br />To review prel iminary results of study prior <br />to preparation of draft of final report. <br /> <br />Presentation of final study results. <br /> <br />August 24, 1987 - <br /> <br />Budget <br /> <br />The following budget (exclusive of Bureau costs) has been based <br />on a detailed manpower breakdown of each task (as described in <br />the POS) combined with the LRCWE rate schedule shown in Figure 3. <br />The budget incl udes an $ 8,000 allowance for fees for the review <br />of the Task 2 and Task 4 memorandum by legal counsel familiar <br />with water law (see Task 2 and 4). <br /> <br />Task 1..Data Collection and Review <br />Task 2..Rio Grande Compact <br />Task 3..Closed Basin Project <br />Task 4..Water Rights Administration <br />Task 5. .Potential Storage Sites <br />Task 6..Storable flow analyses <br />Task 7..Final Report <br /> <br />Budget ($ ) <br />$ 16,000 <br />$ 4,000 <br />$ 2,000 <br />$ 3,000 <br />$ 4,000 <br />$ 23,000 <br />$ 5,000 <br />$ 57,000 <br />$ 9,000 <br />$ 66,000 <br />$ 8,000 <br />$ 74,000 <br /> <br />Labor Subtotal <br />Expenses <br />LRCWE TOTl\L <br /> <br />Legal Review Fees <br />STUDY TOTAL <br /> <br />3 <br /> <br />~ l~~"~\d Ri".~~"~~I,\iI1~ W~\'/;\ h-yi\\\)'/;\" ~. <br />
The URL can be used to link to this page
Your browser does not support the video tag.