Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Task No.1 <br /> <br />DATA COLLECTION AND REVIEW <br /> <br />Task El ement No: 1d <br /> <br />Task Summary Memorandum and bibl iography. <br /> <br />Purpose: The data colleeted in Task 1 forms the information <br />base for the remainder of the study and must be organized. <br /> <br />Approach: <br /> <br />1. Prepare a summary describing the collected and reviewed <br />information. <br />2. Use the collected information to prepare general <br />descriptions of relevant (to a storable flow determination) <br />existing water supply systems and water users in the <br />basin, as well as the general hydrologic characteristics <br />of the basin. This task does not include the preparation <br />of descriptions for the Closed Basin Project, the Rio <br />Grande Compact or water rights administration which are <br />incl uded in following subsequent tasks. <br />3. Prepare a bibl iography of pertinent documents, including <br />where they can be found. <br /> <br />Work Product: A task summary memorandum summarizing the <br />information reviewed and containing general descriptions of <br />the existing hydrology, water supply and water demand systems. <br />This memorandum will be provided to the CWCB, SLVWCD, and <br />USBR for review. <br /> <br />8 <br /> <br />~ Leonard Rice Consulting Waler Engineers, Inc. <br />