Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />February 1997 and March 1997. February 1997 wellhead depletions were estimated to be the same <br />as occurred in January 1997, and March 1997 wellhead depletions were estimated to be the same as <br />occurred in December 1996, When actual February and March pumping and wellhead depletions <br />are available, the analysis will be rerun and final 1997 plan year replacement requirements due to <br />1996 pumping will be produced. <br /> <br />As shown in Table 1, AGUA's 1996 plan year wellhead depletions totaled 4,875 acre-feet. <br />Table 2 shows the results oflagging the 1996 wellhead depletions. AQUA's total replacement <br />requirement during the 1997 plan year due to 1996 plan year pumping is 820 acre-feet. <br /> <br />G:\3177 _ OOJ\REPORTS\AGUA97 _1.RPT <br /> <br />3 <br /> <br />Printed Fcbl\lary 27, 1997 <br />