Laserfiche WebLink
<br />Waler Project Construction Loan Program-Project Data <br /> <br />Borrower: <br /> <br />City of Loveland <br /> <br />Project i"ame: <br /> <br />Green Ridge Glade Reservoir Enlargement <br /> <br />Project Type: Enlargement <br /> <br />Count)": <br /> <br />Larimer <br /> <br />Drainage Basin: South Plane Water Source: Big Thompson <br /> <br />Tot:.al Project Cost: <br /> <br />$20.000,000 <br /> <br />Funding Sources: City. Authority, and CWCB <br /> <br />T.ype of Borrower: <br /> <br />Municipal <br /> <br />Median Household Income: S30.548 <br /> <br />1998 eWeR Loan: <br />1999 CWCB Loan: <br /> <br />$2.000.000 <br />$3,000.000 <br /> <br />Interest Rate: 4.75% <br />Interest Rate: 4.25% <br /> <br />Term: 10 years <br />Term: 10 years <br /> <br />Annual Volume orWater delivered: 6.000 acre-feet <br /> <br />The City of Loveland is proposing to expand it's existing Green Ridge Glade Reservoir from a capacity <br />of 600 acre-feet 10 6,000 acre. feet. Green Ridge Glade is an off-channel reservoir located about seven <br />miles west of Loveland. The project \\;11 include raising the existing earth embankment dam and <br />replacmg the existing intake tower, outlet works, and spillway as well as relocating an existing county <br />road in the reservoir area. The expanded reservoir will provide emergency storage, drought protection, <br />and bener management of the City's water supplies, Feasibility studies were completed in August 1986, <br />January 1988, and October 1997, <br /> <br />~:':Y <br />" '.,.. <br />", :-~,:.., <br />.. ,.-- <br />.-: T <br />.:- " <br /> <br />,. <br /> <br />I <br /> <br />'. <br /> <br /> <br />- <br />- <br /> <br />, <br />'.. <br /> <br /> <br />Location Map <br /> <br />, <br />.- <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />~ <br /> <br />! <br />