My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PUB00085
CWCB
>
Publications
>
Backfile
>
PUB00085
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2010 3:55:22 PM
Creation date
9/30/2006 10:15:20 PM
Metadata
Fields
Template:
Publications
Year
1999
Title
Construction Fund Annual Report 1999
CWCB Section
Finance
Author
CWCB
Description
Construction Fund Annual Report 1999
Publications - Doc Type
CF Annual Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br /> <br />Water Project Construction Loan Program-Project Data <br /> <br />I <br /> <br />Borrower: <br /> <br />Consolidated Mutual Water Company <br /> <br />I <br /> <br />I'rojecl :"ame: <br /> <br />Fortune ReservOir <br /> <br />Project Type: New Storage <br /> <br />I <br /> <br />Count~.: <br /> <br />Jefferson <br /> <br />Drainage Basin: South Plane \Vater Source: Clear Creek <br /> <br />Totall'rojecl Cost: <br /> <br />$21.585.000 <br /> <br />Funding Sources: Company and CWCB <br /> <br />I <br /> <br />Type of Borrower: <br /> <br />Municipal <br /> <br />~ledian lIousehold Income: $34,000 <br /> <br />oven Loan: <br /> <br />$10.000,000 <br /> <br />Interest Rate: 4.75% <br /> <br />Term: ) 0 years <br /> <br />I <br /> <br />Annual Volume ofWarer delh'ered: 9.000 acre-feet <br /> <br />I <br /> <br />The project involves the construction of a 9,000 acre-foot reservoir with a 105 foot-high, zoned earth <br />embankment; an emergency spillway capable of passing the Probable Maximum Flood: and a 3D-mch <br />diameter inlet/outlet plpehne. The reservoir will be hydraulically connected with the rest of the <br />Company's Maple Grove raw waler system through 5 !-S miles of new pipeline. Geotechnical and <br />hydrologic mvesllgations as well as final project deSign have been completed. The State Engineers Office <br />is currently revie\\"mg the design documents, <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br /> <br />'-;"''::'I""''':S~jl--I'~_ -"'.;: I <br />- ,e~~ tl"-iJtc <br />-.=1- \...^ (.....r'"': _. -L <br />. ~'28 <br />01./1." ."....-(: <br />"':! t". ....;='i <br />.-. ':., r- <br />-==~~ <br />. --,:--,.---. <br />-.- ..~:"":."" <br /> <br />I <br /> <br />. '-" ~ <br />'11~ <br />I <br />. <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />Location Map <br /> <br />I <br /> <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.