Laserfiche WebLink
<br />I <br /> <br />I <br /> <br />5.0 Studies and Investigations <br /> <br />I <br /> <br />From time to time over the years. the Board has recommended. and the General <br />Assembly has approved. the use of the Construction Fund to support a number of non- <br />reimbursable (grant) studies. investigations. and projects. In FY 99. the Board <br />recommended 8 non.reimbursahle studies and projects totaling 53.99 million. These <br />grant recommendations. which were incorporated into 58 99.173 and passed by the <br />General Assembly. are listed in the table belo\\'. <br /> <br />I <br /> <br />I <br />I <br />I <br /> <br />TABI.EI~ <br />Colorado \Vater Consen"ation Board <br />1999 Granl Recommendalions <br /> <br />I <br /> <br />G....ntre- Projed COUD~' Amoun' <br />C\\'CB and Slate Engineer - baSinwide 3,158.380 <br />RIO Grande DeciSIOn Support Syslem Data CollecllOn & DeSign ContmuatlOn <br />Slate Engineer - slate'\.ndc ]20,000 <br />Sate-line :vfomlonng System Maintenance Contmuatlon <br />C\\'CB- baslmnde -to.OOO <br />Arkansas Ri"er Multi-ObJective :-"1anagement Plan ('ontmu:llion <br />eWCB. slatewlde 170,000 <br />ImaglOg System for the Construction Fund Project Records <br />C\I,.'CB and Stale Engmeer. bastn\\"Ide 100.000 <br />South Plane Ri"er DeCIsion Suppon System FeaSibility Study <br />San LUIS Valley Water Conservancy DIStrict. baSinwide 200.000 <br />Rio Grande Headwaters Restoration Project <br />Southeastern Colorado Water and Storag.e Needs Assessment Emerpnse . hasiO\nde 25,000 <br />Arkansas River Bastn Water and Slorage Needs Assessment Phase 2 <br />CWCB. Arapahoe 75.000 <br />Cherry Creek ReserVOir Flood Safety Investigation <br /> Total $3.988.380 <br /> <br />I <br /> <br />I <br /> <br />I <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />5,) <br /> <br />Rio Grande Decision Support System Data Collection and Design <br />Continuation <br /> <br />I <br /> <br />The Board recommended an appropriation of 52.983.380 during FY 99.00 to the <br />Di\"ision of Water Resources and thc eWeB for the conllnued dcvelopment of the Rio <br />Grande Decision Suppon System (RDGSS). The Board also appropriated an additional <br />5175.000 for 2.5 FTE's to suppon project management and wel1 data quality checking. <br />The project is estimated to cost up to 55.0 million over 3 years including 53.5 million for <br />data col1ection and 51.5 million for design. The Board originally recommended an _ <br /> <br />~ <br /> <br />CWeB P'I'99 Annual Repon. pag.e lQ <br />