My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PUB00076
CWCB
>
Publications
>
Backfile
>
PUB00076
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2010 3:55:22 PM
Creation date
9/30/2006 10:14:25 PM
Metadata
Fields
Template:
Publications
Year
1988
Title
Construction Fund Annual Report 1988
CWCB Section
Finance
Author
CWCB
Description
Construction Fund Annual Report 1988
Publications - Doc Type
CF Annual Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />It is therefore recommended that the moneys for the project <br />not be made available by the Board. until the Board has. in its <br />sole discretion determined that the project is technically and <br />financially feasible. The project is being recommended without <br />Board review and a completed feasibility study to assure use of <br />currently available matching funds. <br /> <br />If the project is found feasible by the Board. it is <br />estimated that SCS will prepare drawings and specifications by <br />the next construction season. Then the project may be bid and <br />constructed before next winter. This will enable the company <br />to have their rehabilitated project ready for next spring. <br /> <br />Ibj <br /> <br />-2- <br />
The URL can be used to link to this page
Your browser does not support the video tag.