My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PUB00076
CWCB
>
Publications
>
Backfile
>
PUB00076
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2010 3:55:22 PM
Creation date
9/30/2006 10:14:25 PM
Metadata
Fields
Template:
Publications
Year
1988
Title
Construction Fund Annual Report 1988
CWCB Section
Finance
Author
CWCB
Description
Construction Fund Annual Report 1988
Publications - Doc Type
CF Annual Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />/. <br /> <br />~ <br /> <br />Colorado Water Conservation Board <br /> <br />DeWeese Dye Ditch Project <br /> <br />DeWeese Dye Ditch and Reservoir Company <br /> <br />February. 1987 <br /> <br />Introduction <br /> <br />The DeWeese Dye Ditch and Reservoir Company (Company) has <br />submitted on January 11. 1988 an application for State funding <br />in the amount of $106.000 on the subject project. The company <br />serves irrigation water to 725 users who own 1.100 acres of <br />land southwest o[ Canon City in Fremont County. <br /> <br />Proposed proiect <br /> <br />In order to eliminate serious seepage losses in the <br />existing open ditch the company needs to install about 3.000 <br />feet of ~2. corrugated metal pipe and 3.000 feet o[ 30. <br />concrete ditch lining. The estimated total cost o[ this <br />project is $212.000 and the company has a commitment [rom the <br />Agricultural Stabilization and Conservation Service (ASCS) [or <br />$106.000. <br /> <br />Proposed Financinq <br /> <br />DeWeese Dye Ditch and Reservoir <br />Company (grant money from ASCS) <br />CWCB loan at 5 percent interest <br /> <br />$106.000 <br /> <br />106.000 <br />$212.000 <br /> <br />Total <br /> <br />Under the proposed financing arrangement. the company would <br />have to pay the CWCB $6.177.68 per year for 40 years for a <br />total repayment of $2~7.l07.20. The $6.177.68 per year would <br />be raised by the company through annual assessment of the <br />shareholders. <br /> <br />Recommendation <br /> <br />The required feasibility study [or this project is being <br />prepared by the Soil Conservation Service (SCS) and the staff <br />cannot evaluate the project at this time. <br /> <br />607~E <br />
The URL can be used to link to this page
Your browser does not support the video tag.