My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PUB00074
CWCB
>
Publications
>
Backfile
>
PUB00074
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2010 3:55:22 PM
Creation date
9/30/2006 10:14:22 PM
Metadata
Fields
Template:
Publications
Year
1985
Title
Construction Fund Annual Report 1985
CWCB Section
Finance
Author
CWCB
Description
Construction Fund Annual Report 1985
Publications - Doc Type
CF Annual Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />North Poudre No. 15 Reservoir <br /> <br />This reservoir is now under restrictive orders from the <br />State Engineer due to dam safety problems and cannot be filled to <br />capacity. The project would repair and rehabilitate the dam <br />embankment so that the full capacity for the reservoir could be <br />restored. <br /> <br />San Miguel Water Conservancy District Project--Phase 2 <br /> <br />. <br />This project calls for the construction, enlargement and <br />rehabilitation of several interrelated irrigation systems in the <br />vicinity of Norwood and Naturita. The construction of the Marie- <br />Scott reservoir would result in increased yields for irrigation <br />of about 20,000 acre-feet per year. <br /> <br />North poudre No. 2 Reservoir <br /> <br />This reservoir was restricted in capacity by the State <br />Engineer's Office because of deterioration of the present <br />embankment and outlet works. The proposed project would repair <br />existing deficiencies and allow the restoration of the reservoir <br />to full capacity. <br /> <br />Clark Lake <br /> <br />Clark Lake is used as a regulating pool to equalize <br />quantities of water delivered downstream. Because of <br />deterioration of existing structures, storage of the reservoir is <br />restricted by the State Engineer's Office. Repairs to the <br />project will lift the restrictions imposed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.