Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br />( <br /> <br />'-',-,', <br /> <br />I <br />, \ <br /> <br />533 acre feet. <br /> <br />By raising the crest approximately five feet <br /> <br />(5') in elevation, it is estimated that 1,400 acre feet of <br /> <br />additional storage capacity can be realized. <br /> <br />FEASIBILITY STUDY <br /> <br />A feasibility study has not been completed on this <br /> <br />facility. A feasibility study has been initiated, however, and <br /> <br />is in progress. <br /> <br />PROPOSED PROJECT <br /> <br />In order to restore the facility to 100-percent uti- <br /> <br />lization, it will be necessary to reconstruct th9 embankment <br /> <br />frontface, including placement of additional fill material, <br /> <br />filter gravel and riprap, and raise the crest of the dam to <br /> <br />provide proper freeboard. <br /> <br />In addition, a new outlet system <br /> <br />will be required. This will entail breaching the dam, removing <br /> <br />existing structures, and constructing new reinforced concrete <br /> <br />outlet works. The new outlet would include a new intake trash <br /> <br />rack, new control gates, a new energy dissipator, and a new <br /> <br />reinforced concrete outlet conduit. <br /> <br />The total cost of rehabilitating the structure is <br /> <br />estimated at $1,000,000. <br /> <br />North Poudre would pay one-half <br /> <br />through assessments and obtain funding of one-half from the <br /> <br />Colorado Water Conservation Board. <br /> <br />AVH:clp-402 <br /> <br />, ' <br />','.. <br /> <br />( <br /> <br />n <br />i <br />..J 3 -i <br /> <br />r' <br /> <br />(f () , ' <br /> <br />.' <br />