My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PUB00074
CWCB
>
Publications
>
Backfile
>
PUB00074
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2010 3:55:22 PM
Creation date
9/30/2006 10:14:22 PM
Metadata
Fields
Template:
Publications
Year
1985
Title
Construction Fund Annual Report 1985
CWCB Section
Finance
Author
CWCB
Description
Construction Fund Annual Report 1985
Publications - Doc Type
CF Annual Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />(72,600 acre-feet) and for Naturita Reservoir (9,200 acre-feet). <br />A preliminary evaluation of these water rights indicates that they <br />could yield about 31,700 acre-feet annually of new water for the <br />proposed project. However, due, to probable structural <br />restrictions, only about 20,800 acre-feet of water will be <br />available on the average for project purposes. <br /> <br />A preliminary estimate of the cost of the project is <br />$15,000,000. This cost includes $ 1 million for detailed <br />feasibility studies for the various components of the project, <br />which studies must be done to confirm the technical and financial <br />feasibility of the project before the final design work and <br />construction is initiated. <br /> <br />Proposed Financing <br /> <br />The proposed funding for this project is as follows: <br /> <br />San Miguel WCD (bonds or commercial loans) <br /> <br />$ 7,500,000 <br /> <br />CWCB funds (to be repaid by user charges) <br />Total <br /> <br />7,500,000 <br />$15,000,000 <br /> <br />. <br /> <br />Under this financing arrangement payments to CWCB would be <br />$437,100 per year at 5% interest for 40 years for a total <br />repayment of $17,484,000. When the retirement of a bond issue for <br />the entity's 50% share is included, it is estimated that the <br />District would have to pay an additional amount of $954,720 per <br />year (assuming an $9.0 million bond issue, which would include <br />interest during construction and reserve accounts at 10% per year, <br />to be repaid in 30 years). Adding $20,000 per year for operation <br />and maintenance cost increases and $43,710 per year for the CWCB <br />required reserve fund, the total annual expenses for the project <br />are $1,460,530. <br /> <br />With annual charges of $1,460,530, the water made available <br />by the project (estimated at 20,800 acre-feet) would have to sell <br />at $70.25 per acre-foot. This compares with an estimated value of <br />$65 per acre-foot for new water under the Lone Cone Reservoir <br />system. Estimates of the value of water throughout the project <br />area have not yet been made. <br /> <br />Recommenda tion <br /> <br />The San Miguel Water Conservancy District Project is unique <br />in that it consists of several interconnected sub-systems. The <br />overall financial feasibility of the project will be a function of <br />how these component parts are fit together. In order to be able <br />to maximize the efficiency of the overall project and integrate <br />the several sub-systems into the best possible financial package, <br />the entire project needs to be moved forward as a whole at this <br />time. <br /> <br />. <br /> <br />-4- <br />
The URL can be used to link to this page
Your browser does not support the video tag.