My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PUB00073
CWCB
>
Publications
>
Backfile
>
PUB00073
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2010 3:55:23 PM
Creation date
9/30/2006 10:13:50 PM
Metadata
Fields
Template:
Publications
Year
1997
Title
Construction Fund Annual Report 1997
CWCB Section
Finance
Author
CWCB
Description
Construction Fund Annual Report 1997
Publications - Doc Type
CF Annual Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />I <br />I <br />I <br /> <br />I <br />I <br /> <br />I <br />I <br /> <br />I <br /> <br />I <br />I <br />I <br /> <br />4.0 Non-Reimbursable Grants and Other Recommendations <br /> <br />From time to time over the years. the Board has recommended. and the General Assembly has <br />approved, the use aCthe Construction Fund to support a number of non-reimbursable (grant) studies, <br />investigations. and projects. This year the Board is recommending 7 non-reimbursable studies and <br />projects totaling 52.57 million. These grant recommendations are listed in Table 8 below. <br /> <br />TABLE 8 <br />Colorado 'Vater Conservation Board <br />1998 Grant Recommendations <br /> <br />Grantee ~ Project County Amount <br />eWeB and State Engineer. basin.....ide 2.000,000 <br />Rio Grande Decision Suppan System Data Collection & Design <br />State Engineer. statewide 120.000 <br />Satellite ~1onitonng System ~Iaintenance Continuation <br />State Engineer- basinwide 75,000 <br />Arkansas River Well Measuremenl Program Continuation <br />CWCll- Douglas 200,000 <br />Chatfield Rt:servoir Rt:allocation Ft:aslbility Study Incrt:ast: <br />cwes- basinwidt: 56,000 <br />South Plant: Rivt:r ~ulti-Objectivt: Floodplain Management Plan Continuation <br />CWCD- Routt 30.000 <br />Lower Elk Rivt:r Floodplain ~tanagement Plan <br />Denver ~tuseum of:-.;'atural History/U.S. Geological Sun.t:y- Oenverllasin 90,000 <br />Geo-Hydrologic Investigation of the Denvt:r Basin Aquifers <br /> TOlal S2.571,Ooo <br /> <br />4.1 Rio Grande Decision Support System Data Collection and Design <br /> <br />A contractor has recently completed a feasibility study under the guidance of a technical advisory <br />committee (T AC). Significant savings in design costs will be realized due to our work on the <br />Colorado River Decision Support System. However the extensive groundwater component in the <br />Rio Grande basin will require a significant expenditure for collection of new data. The project is <br />estimated to cost up to 55.0 million over 3 years including 53.5 million for data collection and S 1.5 <br />million for design. Based upon the recommendation of the T AC. the CWCB recommends an <br />appropriation of up to S~.OOO.OOO during FY9S-99 to the Division of Water Resources and the <br />CWCB to collecr dat;l, manage the design oftt.e system, develop the necessary datab:1Scs. models. <br />and user tools. and to acquire. operate. and maintain the associated hardware and software. The <br />CWeB and Division of Water Resources will conrinue 10 rely upon the T AC for advice. <br /> <br />CWCS FY97 Annual Report. page 25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.