<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />3.0 Water Project Construction Loan Program <br /> <br />3.1 Eligible Projects <br /> <br />Under authority of Section 37-60-119 and 121, CRS, the monies in the Construction Fund are <br />to be used for new storage projects which increase the beneficial consumptive use of Colorado's <br />compact-entitled waters and for the repair and rehabilitation of existing storage and raw water <br />delivery systems. The CWCB may recommend funding of the following types of water projects <br />through this program: <br /> <br />. Construction of new reservoirs or enlargement of existing dams to enhance water supplies <br />and develop Colorado's compact entitlement. <br /> <br />. Rehabilitation of existing dams to meet safety standards and to recover lost storage capacity. <br /> <br />. Repair or construction of water resources infrastructure for agricultural or municipal raw <br />water supply systems including such facilities as diversion structures, canals, ditches, and <br />pipelines. <br /> <br />. Improvements in water management to increase water use efficiency, to maintain or increase <br />water supplies, or to increase beneficial consumptive use. <br /> <br />. Mitigation of impacts on fish and wildlife due to dam construction. <br /> <br />. Improvements in management of information about Colorado's water. <br /> <br />The costs of acquisition of land and water rights is generally not eligible for CWCB funding <br />except as part of a project. The CWCB does not currently provide funding for municipal water <br />treatment and distribution systems. Up to 5-percent of the Board's annual revenue may be used to <br />finance flood control projects. <br /> <br />The CWCB's financial participation in any single project is generally limited to a maximum of <br />75-percent of the total engineering and construction cost of the project. The CWCB may loan up <br />to 50-percent of the cost of a feasibility study for a water project. The Board's feasibility study loan <br />must be repaid whether a project is constructed or not. <br /> <br />CWCB FY97 Annual Report, page 15 <br />