Laserfiche WebLink
<br />I <br /> <br />TABLE 2, Performance Audit Recommendations <br /> <br />I <br /> <br />Rec. <br />No. Recommendation Summarv Proeress as of June 30.1997 <br />I Develop a formal, systematIC program or process which Completed. The Board agreed 10 lmplemenllhis <br /> provides a ]ong- and short-term framework for the use of recommendatlon by 12/9). The Board identified S long- <br /> the Construction Fund ThIs process should Include term goals at lIS January 1993 meellng_ The Board attended <br /> developing broad polley st31l:ments,eS1Jblishlng goals a retreat In October 1993 to develop a draft Long Range <br /> and Implementanon plans and developing perforrnam:c Plan The Board's Long Range Plan was formally adopted <br /> measures. on September 14, 1994 and reVIsed July 1995 <br />2 Dnelop and Implement an effcclIve process for long- Completed. The Board agreed to Implement thIS <br /> term financial plannmg ofConstrucuon Fund monl(~s. recommendatIon by 12193. The Board staff .....orked with <br /> This process should mclude estabhshmg long-term D:'>iR accountmg to set up a bener method of systematically <br /> fundmg needs, asseSSlllg current sources of funds. and reponmg revenues. All accounts have been reconciled. A <br /> proJecllng future fundIng requuements that may be Water user needs survey was completed in July 1993. A <br /> needed to meet long-term goals. Long-Term FinanCial ProjectIon for the Construcllon Fund <br /> was completed in December 1993 and IS revised annuallv_ <br />J Establish gUldelmes which include sellmg loan inlereS! Completed. The Board agreed to p:anially Implement thIS <br /> rates to reflectmarkel interestr:ates. The Guidelines recommendation by 7/93. The Board appro\'ed new <br /> should be reflected In the projects thaI WIll be authoTlzed "standard" interest rate guidelmes at 2 basis points below <br /> during the upcommg leglslallvesession. the then 30-year Treasury Bond r:ate for 30 years at its May <br /> 6-7,1993 meellng_ A project evaluation matra is being <br /> used on new oroieclS. <br />, Charge interest on cash disbursements made to prOject Completed. The Board agreed to Implement thIS <br /> sponsors dUring the construcllon phase of projects recommendation b)' 12/93. The Board adopted Ihis new <br /> Interest chargcs could be added to the pnnclpal amount policy at liS May mceting. The Contracts for future <br /> of the loan and financed over the term oflhe loan. ,onstruction projects wIll require mterestduring <br /> constructIon. <br />S Improve Board mOllllonng of projects by COntacting Ongolng_ The Board agreed to implcment thIS <br /> project sponsors at least annually to detcrmine IfprojCCI recommendallon by 12193. Lellersarc sent in Sept. to Nov. <br /> sponsors plan to go ahead With the projects. Responses to the sponsors for cenam authorized but nOI yet constructed <br /> should be documented and reponed 10 the General CWCB projects. The staff evaluates the status of the project <br /> Assembly on an annual basis. and delenmnes If II should be deauthorized. <br />6 Develop and implement procedures which would reco~'er Completed. The Board agreed to implement this <br /> the Board's share of feasibility study COStS for projects recommendation by 10/93. The Board adopted a new policy <br /> that are not constructed, Altemall\'es should be at ItS May 1993 meetmg thaI stated the Board's partlcipallon <br /> evaluated. mcludmg payback o\'er a peTlod of lime, m feasibility study costs must generally be repaid whether <br /> lhe proJect;s constructed or not. The GUIdelines have been <br /> reVIsed to reflect this policy_ <br />, De~elop methods to demonstratc Board comphance WIth Completed The Board agreed to Implement lhlS <br /> procedures It has established. including-documentatIon of recommendallon by 7193 A project checklist was prepared <br /> all Board TC\'lews and approvals by staff In July 1993. A standard conlractlnformation sheel <br /> v.asdeveloped Several procedures ha\'e been "Tlnen <br /> down, Insurance certIficates and UCC documents are <br /> tracked. A computer lracking syslem was deSIgned In 1997. <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />CWCB FY97 Annual Repon, page 1.: <br /> <br />I <br />