Laserfiche WebLink
<br />-I <br />\ <br /> <br />I <br />F <br />\ <br /> <br />I <br />I <br />I <br /> <br />I <br />-r- <br /> <br />,\ <br />r <br />I <br /> <br />I. <br /> <br />Water and Storage Needs Assessment <br />SECWCD/Assessment Enterprise <br />December 10,1998 <br /> <br />Transmountain Diversion <br /> <br />1986-1995 <br />Avera!!e DeIiverv(1) Water ADDortioned to(l): <br />(af/yr) <br /> <br />1,012 Pueblo <br /> <br />Ewing Ditch <br />Wurtz Ditch <br /> <br />2,549 Pueblo <br /> <br />. Homestake Tunnel <br /> <br />22,187 Aurora/Colorado Springs <br /> <br />. Busk-Ivanhoe Tunnel <br /> <br />4,808 <br />40,349 <br />129 <br />131,464 <br /> <br />Pueblol Aurora <br /> <br />Twin Lakes Tunnel <br /> <br />Colorado Springs/Pueblo/Others <br />Catlin Canal Company <br /> <br />Larkspur Ditch <br /> <br />(1) Source: Upper Colorado River Commission 1995 Annual Report. <br />(2) Arkansas River Basin Study Phase I Report (Boyle, 1988). <br /> <br />A key transmountain diversion for the SECWCD service area is the Fry-Ark Project, which <br />began diversion operations in 1972, Water is diverted from the mainstream of the Fryingpan <br />River and its tributaries and delivered through the Charles H. Boustead Tunnel to the Lake Fork <br />of Arkansas River. Imported water is 'stored in Turquoise Reservoir on the Lake Fork and in <br />Twin Lakes via conveyance through the Mt. Elbert Conduit. Terminal storage for Fry-Ark water <br />is provided at Pueblo Reservoir. Turquoise Reservoir also regulates transmountain diversions <br />through the Busk-Ivanhoe Tunnel and the Homestake Tunnel. . Twin Lakes Reservoir stores <br />water imported through the Boustead Tunnel, as well as water imported through the Homestake <br />T'lnne1 D'lring 1986-1995, an a"erage of 48,715 afi')'I'-Was imported to the .\Fk-ansas Bastn- <br />through the Boustead Tunnel. In 1995, a wet year, 90,460 afwas brought through the tunnel and <br />stored in available reservoir space. In 1996, only 36,000 af was brought through the tunnel <br />because of carry-over in East Slope storage from 1995. Details on operations of the Fry-Ark <br />Project are provided in Section 7.0 of this report. <br /> <br />2.1.3 Operation ofthe Fryingpan-Arkansas Project <br /> <br />Operation of the Fry-Ark Project was originally defined in the report authorizing the Project and <br />has evolved over time. Currently, Project operations, which are implemented by the USBR, can <br />be summarized as follows: <br /> <br />I. Adequate vacant space is created in Turquoise Lake and Twin Lakes by the end <br />of April, in anticipation of the current year diversions of Project and non-Project <br />water from the west slope. This is accomplished through the release of Project <br />water from the upper two reservoirs and conveyance of such water down the <br /> <br />97411\FinaU\TEXT_A.WPD <br /> <br />~ GEl Consultants, Inc. <br /> <br />2-3 <br />