My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PUB00056
CWCB
>
Publications
>
Backfile
>
PUB00056
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2009 11:40:44 AM
Creation date
9/30/2006 10:10:35 PM
Metadata
Fields
Template:
Publications
Year
2001
Title
Conference Proceedings: 26th Annual Gunnison Water Workshop
CWCB Section
Administration
Description
Theme of the conference was Who's in Charge?
Publications - Doc Type
Other
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
139
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />JUL, 13,2001 12: 17PM <br /> <br />LEAVENWORTH & KARP <br /> <br />NO, 992 <br /> <br />r 6 <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />· ,'There is a 6O-day period for filing statements of opposition; <br />· The matter is referred to the water referee; <br />· If the matter is contested, it may be re-referred to the water judge; <br />· The end result is the entry of a decree either denying the application or <br />granting the application by confirming the water right, establishing its <br />pl'iority and determining the various parameters of the water right. <br /> <br />D. Determination jof Priority <br /> <br />1. Courts )ldjudicate a water right by confirming that an appropriation bas been <br />made a(1d establishiug the date of appropriation of the water right. <br /> <br />2, The dat~ of appropriation is the day on which the appropriation was initiated. <br /> <br />3. The pri~rity of a water right is derived from a combination of the adjudication <br />date an4 the appropriation date: <br />· All water rights adjudicated in a given year are junior to those water <br />~ghts adjudicated in previous years. <br />· },\S between water rights a4judicated in the same year. the date of <br />~ppropriation controls, <br />· 'the "year of adjudication" is the year in which the application was <br />l!ued. <br /> <br />4. The "pqstponement doctrine" provides that a water right which has not been <br />adjudic*ed shall be junior to all water rights which have been adjudicated <br />regardl~ss of when the water right was appropriated, <br /> <br />E. Water Rights ~dministration <br /> <br />1. The Colprado State Engineer's Office administers the exercise of water right$ <br />acCOrdlJtg to their priorities. <br />· the state engineer's tabulation of water rights facilitates that <br />a\:lmiJJistratlon. <br /> <br />2. Water c4mmissioners atlminister rights by curtailing diversions by junior water <br />right$ when senior water rights are not fully satisfied. <br /> <br />.3- <br />
The URL can be used to link to this page
Your browser does not support the video tag.