My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PUB00054
CWCB
>
Publications
>
Backfile
>
PUB00054
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2010 3:55:23 PM
Creation date
9/30/2006 10:10:28 PM
Metadata
Fields
Template:
Publications
Year
1983
Title
Construction Fund Annual Report 1983
CWCB Section
Finance
Author
CWCB
Description
Construction Fund Annual Report 1983
Publications - Doc Type
CF Annual Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />PRELIMINARY CONSTRUCTION COST ESTIMATE <br /> <br />MONUMENT CREEK RESERVOI R (RELOCATED) <br /> <br /> UNIT <br /> ITEM NO. QUANTITY UNIT PRICE <br />1. *Excavation & Embankment 550,000 C. Y. $3.50 <br />2. Outlet Works Lump Sum <br />3. Side Spillway T~ump Sum <br />4. Roadway Relocat ion Lump Sum <br />5. Recreat ional Facilities Lump Sum <br /> <br />Subtotal <br />+ 15% Contingency <br />+ 20% Engrng., Legal & R/W <br />Total <br /> <br />*Assuming all embankment material can be borrowed from reservoir site. <br /> <br />AMOUNT <br />1,925,000 <br />80,000 <br />450,000 <br />500,000 <br />245,000 <br />3,200,000 <br />480,000 <br />640,000 <br />$4,320,000 <br /> <br />602 con/cost/est <br /> <br />. . <br />
The URL can be used to link to this page
Your browser does not support the video tag.