Laserfiche WebLink
<br />. <br /> <br />PRELIMINARY CONSTRUCTION COST ESTIMATE <br />CORTEZ--TOWAOC M & I PIPELINE <br />(19.5 miles of pipeline with two turnouts) <br /> <br /> ITEM NO. QUANTITY <br />~- Excavation 45,690 <br />2. Pipe: 10-AC-50 4,000 <br />3. Pipe: 12-AC-40 1,300 <br />4. Pipe: 12-AC-45 16,700 <br />5. Pipe: 12-AC-50 14,100 <br />6. Pipe: 12-AC-60 7,500 <br />7. Pipe: 15-AC-50 5,800 <br />8. Pipe: 15-AC-60 15,700 <br />9. Pipe: 18-AC-40 600 <br />10. Pipe: 18-AC-45 1,100 <br />11. Pipe: 18-AC-50 8,400 <br />12. Pipe: 18-AC-60 600 <br />13. Pipe: 21-AC-45 2,100 <br />14. Pipe: 21-AC-50 8,700 <br />15. Pipe: 21-AC-60 16,400 <br /> Subtotal 103,000 <br /> Pipe installation 103,000 <br /> <br />UNIT <br /> <br />PRICE <br />1.60 <br />5.241 <br />5.58 <br />6.95 <br />7.22 <br />8.91 <br />13 .45 <br />16.37 <br />13.20 <br />13.36 <br />15.10 <br />18.63 <br />21.62 <br />22.58 <br />28.01 <br /> <br />UNIT <br />yd3 <br />l.f. <br />1 . f . <br />l.f. <br />l.f. <br />l.f. <br />l.f. <br />l.f. <br />l.f. <br />l.f. <br />l.f. <br />l.f. <br />l.f. <br />l.f. <br />l.f. <br /> <br />Pipe only <br /> <br />l.f. <br /> <br />5.00 <br /> <br />16. <br />17. <br />18. <br />19. <br />20. <br /> <br />yd3 <br />yd3 <br />ea. <br />ea. <br /> <br />1.00 <br />3.10 <br />700.00 <br />900.00 <br /> <br />Backfill <br />Compacted backfill <br />Drain valves <br />Air Valves <br />Unlisted items (bend, tapers, tees <br />asphalt, repair. Lump sum-l0% of pipe cost) <br /> <br />Subtotal <br /> <br />26,830 <br />12,890 <br />18 <br />20 <br /> <br />Continqency (15%) <br />Total <br /> <br />AMOUNT <br />73,104.00 <br />2&,960.00 <br />7,254.00 <br />116,065.00 <br />101,802.00 <br />66,825.00 <br />78,010.00 <br />257,009.00 <br />7,920.00 <br />14,696.00 <br />126,840.00 <br />11,178.00 <br />45,402.00 <br />196,446.00 <br />459,364.00 <br /> <br />1,509,771.00/ <br /> <br />515,000.00/ <br /> <br />26,830.00/ <br />39,959.00/ <br />12,600.00~ <br />18,000.00 - <br /> <br />154,000.00 <br /> <br />2,19S~264.80 <br /> <br />336,666.66 <br /> <br />$2,525,261.88 <br /> <br />lCost of pipe delivered to Cortez, Colorado. Estimate made November 3, 1982. <br />Quote by Dave Wade at Certan Teed Pipe, Denver, Colorado. <br /> <br />2Prices are average for 9 bids on similar Western Slope projects bid in 1981 and <br />1982. <br /> <br />602 cost/est <br /> <br /> <br />. <br /> <br />~ 34-9 -z..6tf,oo <br />) I <br />3S"~)3qO.oO <br />~,70\! 65'4-.00 <br />