<br />.
<br />
<br />PRELIMINARY CONSTRUCTION COST ESTIMATE
<br />CORTEZ--TOWAOC M & I PIPELINE
<br />(19.5 miles of pipeline with two turnouts)
<br />
<br /> ITEM NO. QUANTITY
<br />~- Excavation 45,690
<br />2. Pipe: 10-AC-50 4,000
<br />3. Pipe: 12-AC-40 1,300
<br />4. Pipe: 12-AC-45 16,700
<br />5. Pipe: 12-AC-50 14,100
<br />6. Pipe: 12-AC-60 7,500
<br />7. Pipe: 15-AC-50 5,800
<br />8. Pipe: 15-AC-60 15,700
<br />9. Pipe: 18-AC-40 600
<br />10. Pipe: 18-AC-45 1,100
<br />11. Pipe: 18-AC-50 8,400
<br />12. Pipe: 18-AC-60 600
<br />13. Pipe: 21-AC-45 2,100
<br />14. Pipe: 21-AC-50 8,700
<br />15. Pipe: 21-AC-60 16,400
<br /> Subtotal 103,000
<br /> Pipe installation 103,000
<br />
<br />UNIT
<br />
<br />PRICE
<br />1.60
<br />5.241
<br />5.58
<br />6.95
<br />7.22
<br />8.91
<br />13 .45
<br />16.37
<br />13.20
<br />13.36
<br />15.10
<br />18.63
<br />21.62
<br />22.58
<br />28.01
<br />
<br />UNIT
<br />yd3
<br />l.f.
<br />1 . f .
<br />l.f.
<br />l.f.
<br />l.f.
<br />l.f.
<br />l.f.
<br />l.f.
<br />l.f.
<br />l.f.
<br />l.f.
<br />l.f.
<br />l.f.
<br />l.f.
<br />
<br />Pipe only
<br />
<br />l.f.
<br />
<br />5.00
<br />
<br />16.
<br />17.
<br />18.
<br />19.
<br />20.
<br />
<br />yd3
<br />yd3
<br />ea.
<br />ea.
<br />
<br />1.00
<br />3.10
<br />700.00
<br />900.00
<br />
<br />Backfill
<br />Compacted backfill
<br />Drain valves
<br />Air Valves
<br />Unlisted items (bend, tapers, tees
<br />asphalt, repair. Lump sum-l0% of pipe cost)
<br />
<br />Subtotal
<br />
<br />26,830
<br />12,890
<br />18
<br />20
<br />
<br />Continqency (15%)
<br />Total
<br />
<br />AMOUNT
<br />73,104.00
<br />2&,960.00
<br />7,254.00
<br />116,065.00
<br />101,802.00
<br />66,825.00
<br />78,010.00
<br />257,009.00
<br />7,920.00
<br />14,696.00
<br />126,840.00
<br />11,178.00
<br />45,402.00
<br />196,446.00
<br />459,364.00
<br />
<br />1,509,771.00/
<br />
<br />515,000.00/
<br />
<br />26,830.00/
<br />39,959.00/
<br />12,600.00~
<br />18,000.00 -
<br />
<br />154,000.00
<br />
<br />2,19S~264.80
<br />
<br />336,666.66
<br />
<br />$2,525,261.88
<br />
<br />lCost of pipe delivered to Cortez, Colorado. Estimate made November 3, 1982.
<br />Quote by Dave Wade at Certan Teed Pipe, Denver, Colorado.
<br />
<br />2Prices are average for 9 bids on similar Western Slope projects bid in 1981 and
<br />1982.
<br />
<br />602 cost/est
<br />
<br />
<br />.
<br />
<br />~ 34-9 -z..6tf,oo
<br />) I
<br />3S"~)3qO.oO
<br />~,70\! 65'4-.00