My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PUB00054
CWCB
>
Publications
>
Backfile
>
PUB00054
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2010 3:55:23 PM
Creation date
9/30/2006 10:10:28 PM
Metadata
Fields
Template:
Publications
Year
1983
Title
Construction Fund Annual Report 1983
CWCB Section
Finance
Author
CWCB
Description
Construction Fund Annual Report 1983
Publications - Doc Type
CF Annual Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />. <br /> <br />COLORADO WATER CONSERVATION BOARD <br />823 State Centennial Building <br />1313 Sherman Street <br />Denver, Colorado 80203 <br /> <br />January 6-7, 1983 <br /> <br />Stagecoach Reservoir Project <br />(Upper Yampa Water Conservancy District) <br /> <br />Introduction <br /> <br />The Stagecoach Reservoir site is located on the Yampa River <br />about 3 miles east of the towns of Phippsburg and Oak Creek. <br />The proposed project would create a reservoir of about 33,700 <br />acre-feet, of which 3,500 acre-feet would be inactive storage. <br />The project would supply water for future municipal and <br />innustrial uses in addition to providing supplemental irrigation <br />water in the area served by the Upper Yampa Water Conservancy <br />District (District). <br /> <br />. <br /> <br />Study Status <br /> <br />The District submitted an application in September, 1982. <br />CWCS staff met with District representatives, visited the project <br />site, and discussed the project with them. The District decided <br />to fund the initial study with its own money. Colorado-Ute <br />Electric Association, tnc., performed the study. <br /> <br />proposed Project <br /> <br />The Stagecoach Reservoir would be created by the <br />construction of a dam with a maximum height of 145 feet above <br />streambed and a crest length of nearly 900 feet. The reservoir <br />would have a water surface area of approximately 780 acres at an <br />elevation of 7,200 feet. As mentioned earlier, the reservoir <br />capacity would be 33,700 acre-feet of which approximately 3,500 <br />acre-feet would be inactive storage. The outlet works would be a <br />gated, 66-inch diameter steel pipe tapering to 30-inches, thus <br />allowing for the possible addition of a hydropower component to <br />the project at a later date. <br /> <br />The total cost of the project is presently estimated at <br />$12,000,000. Additional analysis of dam designs, which the staff <br />believes are necessary, could affect this estimate. <br /> <br />Discussion <br /> <br />The project raises a number of important pOlicy issues which <br />will need to be addressed, including: <br /> <br />. <br /> <br />119 <br />stage/c <br />
The URL can be used to link to this page
Your browser does not support the video tag.