My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PUB00047
CWCB
>
Publications
>
Backfile
>
PUB00047
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2011 11:11:14 AM
Creation date
9/30/2006 10:09:56 PM
Metadata
Fields
Template:
Publications
Year
2000
Title
SECWD/Arkansas Basin Preferred Storage Options Plan Final Draft Report
Author
GEI Consultants, Inc
Description
SECWD/Arkansas Basin Preferred Storage Options Plan Final Draft Report
Publications - Doc Type
Water Resource Studies
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Final Draft - Preferred Storage Options Plan <br />Southeastern Colorado Water Couservancy District <br />June 8, 2000 <br /> <br />As indicated above, re-operation provides significant advantages in terms of low cost and <br />performance. While gravel lakes storage ranks high, the technology is not well suited for <br />regional water storage development. Enlargement of the planned Williams Creek Reservoir <br />would not provide any significant advantages due to its location. The Lake Meredith <br />enlargement has significant potential water quality and wetlands issues associated with its <br />development. Formulation of the PSOP focused on Fry-Ark Project re-operation with <br />enlargements of Pueblo Reservoir and Turquoise Lake to meet the total storage objective. <br /> <br />The preferred storage plan is summarized below: <br /> <br /> Storage Implementation <br /> Provided Cost 11) Timeframe <br />Phase 1 - Re-operation of the Fryingpan- 48,500 af $ 7,300,000 On-line by 2005 <br />Arkansas Project <br />Phase 2 - New Storage Capacity 54.000 af $75.600.000 On-line by 2010 to <br />Stage 1 - Pueblo Reservoir 2013 <br />Enlargement <br />Stage 2 - Turquoise Lake 19.600 af $14,500,000 On-line soon after <br />Enlargement 12) Stage 1 <br />Total 122.100 af $97.400.000(2) <br /> <br />'" Cost is in current (January 2000) dollars and excludes any escalation for implementation in later years of the <br />planning horizon. <br />(2) Depending on SOD and enlargement reviews by the USSR. the Turquoise lake enlargement could precede the <br />Pueblo enlargement. <br /> <br />Re-operations <br /> <br />Storage in the re-operation space would be subject to the current Spill Priority 4 for the Project <br />and would be spilled before Winter Water in stofage (in amounts up to 70,000 af) is spilled. <br />Modeling studies indicate that re-operation will increase the amount of Winter Water spills by <br />a small amount on an average annual basis. A "spill credit" would be established to compensate <br />the Winter Water entities for potential spills. A portion of the DWMS space also would facilitate <br />better management of Winter Water. The spill credit would be paid from a District <br />DevelopmentlO&M fund that would be generated, in part, by a surcharge on the use of re- <br />operation space, as well as other revenue sources described later in this summary. <br /> <br />The costs of developing the re-operation space, estimated to be $7.3 million (in January 2000 <br />dollars), would be shared by entities participating in re-operation. The cost for fe-operation is <br /> <br />m GEl Consultants, Inc. <br /> <br />VI <br /> <br />J:\PROJECTS\9906I\Reporu\PrefetTed SOP FinaI_wpd <br />
The URL can be used to link to this page
Your browser does not support the video tag.