My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PUB00040
CWCB
>
Publications
>
Backfile
>
PUB00040
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/15/2013 11:01:44 AM
Creation date
9/30/2006 10:08:31 PM
Metadata
Fields
Template:
Publications
Year
2004
Title
2004 Small Project Loan Report
CWCB Section
Finance
Author
CWCB
Description
2004 Small Project Loan Report
Publications - Doc Type
Small Project Loan Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />AQenda Item 25f <br /> <br />Union Oitch Canpany <br />March 16-17, 2004 <br /> <br />Water Project Construction Loan Program-Project Data <br /> <br />Borrower: Union Ditch Company (UDC) <br /> <br />County: Weld <br /> <br />Project Name: UDC Recharge Project <br /> <br />Project Type: Well Augmentation <br /> <br />Drainage Basin: South Platte <br /> <br />Water Source: South Platte River <br /> <br />Total Project Cost: $344,000 <br /> <br />Funding Sources: CWCB, UDC <br /> <br />Type of Borrower: Agricultural <br /> <br />Aver. Delivery: 206 acre-feet (consump. use) <br /> <br />cweB Construction Fund Loan: $309,500 <br /> <br />Interest Rate: 2.50% <br /> <br />Term: 30 years <br /> <br />UDC operates the Union Ditch providing direct flow irrigation water to an area of 5,50G-acres east of <br />the Town of laSalle and south of Greeley. Water is diverted from the South Platte River at a headgate <br />east of the Town of Milliken. UDC operates approximately 15 miles of ditch and typically delivers <br />about 29.000 acre-feet of irrigation water per year. UOC has filed an application for an <br />Augmentation Plan to provide replacement water for 40 junior wells owned by shareholders, <br />formerly serviced by GASP, to replace out-of-priority irrigation well depletions. As part of the <br />Augmentation Plan UDC will need 50 AF of developed recharge storage capacity to offset the <br />depletions. The project involves the development of three recharge structures, with the top priority <br />site, the Mecure #1 Site (20 AF) developed initially in 2004. and the remaining two sites totaling 30 <br />AF developed in 2005. Each pond would be filled by water that is diverted from the Union Ditch. <br />The construction of each site will include pond excavation, flow measurement structures (flumes on <br />feeder canals or meters for pumps). headgate structures for feeder canals, and monitoring and <br />reporting measurement equipment (SCADA). The ponds will be relatively shallow in depth (< 10 <br />feet) and will include an earthen embankment around the perimeter of the pond. <br /> <br /> <br />/ <br />!.t:'- <br /> <br />.. <br /> <br />" <br />.. <br /> <br />~ <br /> <br />:;-J~c; <br />) <br />:-~ ~ <br /> <br />:/ . <br /> <br /> . <br /> '/ . <br /> \ . <br /> , . - ) <br /> . I'~"'\ .. <br />. . --:c: /J..h Q, ~: \ <br />. . I rJ <br /> - " ~ ~ <br /> <br />- <br /> <br />, <br />/ <br />" <br /> <br />:". <br />. <br /> <br />. <br />. <br /> <br /> <br />.. <br /> <br />,- <br /> <br />Location Map <br /> <br />Page 7 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.