Laserfiche WebLink
<br />I' <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />i~ <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Terrace Irrlgatlon Company <br />March 17, 2004 <br /> <br />AQenda Hem 258. <br /> <br />'Vater Project Construction Loan Program-Project DatB <br /> <br />Borrower: Terrace Inigation Company County: Conejos <br /> <br />Project :'lame: Terrace Reservoir Outlet Repairs Project Tn>e: Reservoir Rehabilitation <br /> <br />Drainage Basin: Rio Grande 'Vater Source: Alamosa River <br /> <br />Total Project Cost: $270,000 Funding Sources: Company and CWCB <br /> <br />Type of Borrower: Agricultural Interest Rate: 2.5 <br /> <br />ewCR Loan: $245,430 (Includes Org. Fee) Term: 30 years <br /> <br />CWCR Grant: $5,000 <br /> <br />Average Annual Volume of\\'ater diverted: 15,339 AF <br /> <br />The TIC, located in Conejos County, owns and operates the Terrace Reservoir to deliver direct flow <br />irrigation water for the benefit of the 27 shareholders. Water is stored in Terrace Reservoir from <br />flows from the Alamosa River and released downstream into the Alamosa River and diverted <br />through Main Terrace Canal and the Alamosa Creek Canal. The project involves the construction <br />of a cofferdam to allow access to the outlet works. the removal and replacement of the existing <br />trash rack, debris and sediment removal within the outlet pipe, the repair of the existing double leaf <br />48-inch gate valve in the west outlet tunnel, and general maintenance to the downstream ring-jet <br />valve. <br /> <br /> <br />.- ~ . <br />, <br /> <br />." <br /> <br />- <br /> <br />....... ,.... <br />- ' <br /> <br />" <br />" <br />- <br /> <br />Location Map <br /> <br />5 <br />