My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PUB00017
CWCB
>
Publications
>
Backfile
>
PUB00017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2010 3:55:23 PM
Creation date
9/30/2006 10:03:27 PM
Metadata
Fields
Template:
Publications
Year
1997
Title
Colorado Water Development Study
CWCB Section
Finance
Author
Buford Rice, Ray Christensen
Description
Study to assist Colorado Farm Bureau in developing recommendations and strategies for dealing with future water resource issues
Publications - Doc Type
Brochure
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Seclio/1 5 - C%J"({t!o Willer u.\e Tre/1l!.l <br /> <br /> 500,000 <br /> 450,000 <br />Qi 400,000 <br />2 350,000 <br />cb <br />U <br />~ 300,000 <br />Q) <br />E <br />::> 250,000 <br />0 <br />> <br /> 200,000 <br /> 150,000 <br /> 100,000 <br /> 1980 <br /> <br />80,000 <br /> <br />70,000 <br /> <br />Q; 60,000 <br />~ <br />~ <br /><.> <br />~ <br />Q) <br />E <br />::> <br />o <br />> <br /> <br />50,000 <br /> <br />40,000 <br /> <br />30,000 <br /> <br />20,000 <br /> <br />10,000 <br />1980 <br /> <br /> <br />high estimate <br />01 dry <br />year yield <br /> <br />low estimate _ <br />01 dry <br />year yield <br /> <br />Projected <br />Additional <br />Supply Required <br />= 100,000 ac-It <br />to 200,000 ac-It <br /> <br />--+- Projected Demand <br />Based on Population <br />Projections <br /> <br />__ Projected Demand <br />Based on Survey <br />2000 2020 2040 2060 2080 2100 Results <br /> <br />Year <br /> <br />Figure 17 <br />Projected M & I Demand vs. Dry-Year Yield <br />Water Division 2 <br /> <br /> <br />- high estimate 01 <br />dry year yield <br /> <br />low estimate <br />01 dry <br />year yield <br /> <br />Projected <br />Additional <br />Supply Required <br />=12,000 ac-It <br />to 41 ,000 ac-It <br /> <br />--+- Projected Demand <br />Based on Population <br />Projections <br /> <br />__ Projected Demand <br />Based on Survey <br />Results <br /> <br />2000 2020 2040 2060 2080 2100 <br /> <br />Year <br /> <br />Figure 18 <br />Projected M & I Demand vs. Dry-Year Yield <br />Water Division 4 <br /> <br />5-7 <br /> <br />__ COLoraDO <br />,._ Farm Bureau <br />
The URL can be used to link to this page
Your browser does not support the video tag.