My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PUB00017
CWCB
>
Publications
>
Backfile
>
PUB00017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2010 3:55:23 PM
Creation date
9/30/2006 10:03:27 PM
Metadata
Fields
Template:
Publications
Year
1997
Title
Colorado Water Development Study
CWCB Section
Finance
Author
Buford Rice, Ray Christensen
Description
Study to assist Colorado Farm Bureau in developing recommendations and strategies for dealing with future water resource issues
Publications - Doc Type
Brochure
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Scctio/l .5 - Colomdo IYttlcr u.\C 7,n/(ls <br /> <br /> 2,500,000 <br /> 2,300,000 <br /> 2,100,000 <br /> 1,900,000 <br />OJ <br />2 1,700,000 <br /><h <br />t; 1,500,000 <br />~ <br />'" <br />E 1,300,000 <br />::l <br /><5 <br />> 1,100,000 <br /> 900,000 <br /> 700,000 <br /> 500,000 <br /> 1980 <br /> <br /> 1,600,000 <br /> 1,400,000 <br />OJ 1,200,000 <br />2 <br /><h <br />t; <br />~ 1,000,000 <br />'" <br />E <br />::l <br /><5 <br />> 800,000 <br /> 600,000 <br /> 400,000 <br /> 1980 <br /> <br /> <br />high estimate <br />of dry <br />year yield <br /> <br />low estimate <br />of dry <br />year yield - <br /> <br />2000 2020 <br /> <br />2040 <br /> <br />2060 <br /> <br />2080 <br /> <br />Year <br /> <br />1 <br /> <br />Projected Additional <br />Supply Required <br />=500,000 ac-ft <br />to <br />1,000,000 ac-ft <br /> <br />___ Projecled Demand <br />Based on Population <br />Projections <br /> <br />2100 <br /> <br />____ Projected Demand <br />Based on Survey <br />Results <br /> <br />Figure 15 <br />Statewide Projected M & I Demand vs. Dry-Year Yield <br /> <br /> <br />high estimate <br />of dry l <br />year yield <br /> <br />low estimate <br />of dry <br />year yield <br /> <br />Projected Additional <br />Supply Required <br />=400,000 ac-ft <br />to 650,000 ac-ft <br /> <br />___Projected Demand <br />Based on Population <br />Projections <br /> <br />2000 2020 <br /> <br />____ Projected Demand <br />2040 2060 2080 2100 Based on Survey <br />Results <br /> <br />Year <br /> <br />Figure 16 <br />Projected M & I Demand vs. Dry-Year Yield <br />Water Division 1 <br /> <br />5-6 <br /> <br />~. COloraDO <br />,.. Farm Bureau <br />
The URL can be used to link to this page
Your browser does not support the video tag.