My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PUB00005
CWCB
>
Publications
>
Backfile
>
PUB00005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2010 3:55:23 PM
Creation date
9/30/2006 9:58:42 PM
Metadata
Fields
Template:
Publications
Year
2003
Title
Small Project Loan Report 2003
CWCB Section
Finance
Author
CWCB
Description
Small Project Loan Report 2003
Publications - Doc Type
Small Project Loan Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />South Side Reservoir Company <br />January 22-23. 2003 <br /> <br />Agenda Item 199 <br /> <br />Water Project Construction Loan Program.Project Data <br /> <br />Borrower: South Side Reservoir Company <br /> <br />County: Larimer <br /> <br />Project Name: South Side Reservoir <br /> <br />Project Type: Rehabilitation <br /> <br />Drainage Basin: <br /> <br />South Platte River <br /> <br />Water Source: Big Thompson River <br /> <br />Total Project Cost: $400,000 <br /> <br />Funding Sources: CWCB and Compan;,; <br /> <br />Type of Borrower: AgriculturaVMunicipal <br /> <br />Median Household Income: Average <br /> <br />CWCB Loan: $360,000 <br /> <br />Blended Interest Rate: 3.1% Term: 30 years <br /> <br />CWCB Grant: $5.000 <br /> <br />Total annual storage (fill and refill): 1,241 acre-feet <br /> <br />The South Side Reservoir Company operates the South Side Reservoir for delivery of irrigatit <br />water within a 400-acre service area. The reservoir is located in Larimer County, about 1 mil-t <br />south west of Loveland. This project indudes rehabilitation of the outlet and spillway on the dan., <br />and will allow removal of the existing storage restriction currently imposed by the State Engineer <br />Rehabilitation work is scheduled for 2003. John Gauthiere P.E. has completed the feasibilitf <br />study. Proposed funding for the project consists of a $360,000 Small Project Loan and a $5,000 <br />Feasibility Study Grant from the CWCB, and the remainder from the Borrower. <br /> <br /> <br />/' <br />=-- <br /> <br />:- <br />, <br /> <br />. <br />. <br /> <br />. - <br /> <br />.. <br /> <br />. <br /> <br />. <br /> <br />.- <br /> <br />" <br /> <br />....- <br />~ <br />, <br /> <br />. <br />. <br /> <br />. <br /> <br />-- <br /> <br />J <br /> <br />. <br /> <br />. <br />. <br /> <br />\..", <br /> <br />-' ~ <br /> <br />.. .. <br /> <br />- <br /> <br />,"'- ' <br />y...-- , <br /> <br />. . <br /> <br />Location Map <br />
The URL can be used to link to this page
Your browser does not support the video tag.