Laserfiche WebLink
<br />South Side Irrlgation Company <br />January 22.23, 2003 <br /> <br />Agenda Item 190 <br /> <br />I <br /> <br />Water Project Construction Loan Program-Project Data <br /> <br />Borrower: South Side Irrigation Company <br /> <br />County: Larimer <br /> <br />Project Name: South Side Ditch <br /> <br />Project Type: Rehabilitation <br /> <br />Drainage Basin: <br /> <br />South Platte River <br /> <br />Water Source: Big Thompson River <br /> <br />Totat Project Cost: S80.000 <br /> <br />Funding Sources: eWeB and Company <br /> <br />Type of Borrower: Agricultural/Municipal <br /> <br />Median Household Income: Average <br /> <br />CWCB Loan: $72.000 <br /> <br />Blended Interest Rate: 3.1% Term: 30 years <br /> <br />CWCB Grant: $5.000 <br /> <br />Acre-Feet Diverted: <br /> <br />1 .587 acre-feet <br /> <br />The South Side Irrigation Company operates the South Side Ditch for delivery of irrigation water <br />within a 40D-acre service area. The ditch is 11 miles long and its headgate is located on the Big <br />Thompson River 4 miles west of Loveland. This project indudes rehabilitation of a number of <br />hydraulic structures, and lining portions of the ditch. Rehabilitation work is scheduled for fall 2003. <br />John Gauthiere P.E. has oompleted the feasibility study. Proposed funding for the project <br />oonsists of a $72,000 Small Project Loan and a $5.000 Feasibility Study Grant from the eWeB. <br />and the remainder from the Borrower. <br /> <br /> <br />. <br />. <br /> <br />. <br /> <br />. <br />~ :'11: .o. <br /> <br />." <br /> <br />..., . <br /> <br /> <br />- <br /> <br />Location Map <br />