My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Nucla Gravity Flow System Phase 2 Final Report
CWCB
>
Water Conservation
>
Backfile
>
Nucla Gravity Flow System Phase 2 Final Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/28/2011 4:13:43 PM
Creation date
9/30/2006 9:05:13 PM
Metadata
Fields
Template:
Water Conservation
Project Type
Ag/Muni Grant
Contract/PO #
C153710
Applicant
Town of Nucla
Project Name
Raw Water Gravity Flow Irrigation System
Title
Town of Nucla Raw Water Irrigation Phase II - B
County
Montrose
Water Conservation - Doc Type
Final Report
Document Relationships
Nucla Gravity Flow System Contract
(Attachment)
Path:
\Water Conservation\Backfile
Nucla Gravity Flow System Final Report
(Message)
Path:
\Water Conservation\Backfile
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />TOWN OF NUCLA <br />RAWWATERIRRIGATlON - <br />PHASE ll-B <br /> <br />CONTACTS: MayorM_H. deKoevend <br />Water Commissioner Chris Daniels <br />Public Works Supervisor Carl D. Pender <br /> <br />COlvfPLETION DATE: December 30,1998 <br /> <br />L PROJECT DESCRIPTION <br />To complete Phase II ofa raw water ilTigation project Oll the west side of <br />Town, providing tile major population ofNucla with a water efficient <br />irrigation system and eliminating the need to use treated water for ilTiga- <br />tion. <br /> <br />. <br /> <br />II GOALS AND OBJECTIVES <br />To reduce subst2ntially the amount of treated water used for irrigation; to <br />extend the life of the present Town water treatment plant; to increase the <br />community's capacity to provide potable and nOll-potable water for resi- <br />dential, commercial, or industrial use; to provide better irrigation waler <br />while encouraging water conservati on. <br /> <br />ill PROJECT PLANNING <br />02/15/96 A Research and choose meters <br />04/15/96 B. Set meter rate and billing; revise tap application <br />L Gather usage (A we. vs AS.e.) <br />2. Establish rate structure <br />3. Establish meter procedure <br />a. Cost of meter <br />b. Repair <br />c. Replacement <br />d Install & Remove <br />e. Determine Reading & Billing Procedure & Cost <br />05/01/96 C IdentifY residents for tap applications; map site <br /> <br />. <br /> <br />N. PROJECT IMPLEMENTATION <br />03/08/96 A Retrofitting of head gate <br />04/01/96 B. Locate uti! ities: <br />Dig test holes <br />05/01/96 C. Meter High School and Phase II-A sites <br /> <br />09/30/97 D. Lay pipe; install taps and meters along mapped routes <br /> <br />6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.