My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
I-25 Landscape Master Plan
CWCB
>
Water Conservation
>
Backfile
>
I-25 Landscape Master Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/16/2010 12:31:52 PM
Creation date
9/30/2006 9:05:08 PM
Metadata
Fields
Template:
Water Conservation
Project Type
Water Conservation Plan
Project Name
Department of Transportation
Title
I-25 in Denver, Colorado Landscape Master Plan
Date
5/5/1988
County
Denver
Water Conservation - Doc Type
Complete Plan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />Natural landscape treatments are continued <br />within the Santa Fe Boulevard interchange, <br />North bound traffic drops into this area and will <br />have a lull view of the landscape and the Platte <br />valley, <br /> <br />Natural landscape treatments should be intro- <br />duced along the high 1iI1 slopes south of the <br />Santa Fe Boulevard interchange and leading <br />up to the bridge structure and then continue <br />through the Broadway/Lincoln interchange. <br />where space allows. <br /> <br /> <br />11. <br />
The URL can be used to link to this page
Your browser does not support the video tag.