My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Loveland Indoor Retrofit Workplan
CWCB
>
Water Conservation
>
Backfile
>
Loveland Indoor Retrofit Workplan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/28/2011 10:40:16 AM
Creation date
9/30/2006 9:03:56 PM
Metadata
Fields
Template:
Water Conservation
Project Type
Ag/Muni Grant
Contract/PO #
C153622
Applicant
City of Loveland
Project Name
Indoor Water Use Assessment and Retrofit
Title
City of Loveland Water Conservation Grant Workplan
Date
7/1/1992
County
Larimer
Water Conservation - Doc Type
Work Plan
Document Relationships
Loveland Indoor Retrofit Contract
(Attachment)
Path:
\Water Conservation\Backfile
Loveland Indoor Retrofit Final Report
(Attachment)
Path:
\Water Conservation\Backfile
Loveland Indoor Use Retrofit Approval Ltr
(Message)
Path:
\Water Conservation\Backfile
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />, ' <br /> <br />We will have displays at several events to explain the project <br />and to enlist participants: the Cherry Pie Fest, the Police Fair <br />and the Corn Roast. <br /> <br />B. Laurie D' Audney will be the spokesperson for media calls. <br />She will write news releases and promotional material. Debbie <br />Schmierer will write promotional material for volunteer recruit- <br />ment. <br /> <br />VI. Evaluation and Final Report <br /> <br />A. A follow-up survey will be sent to participants to find out how <br />satisfied they are with the project. The survey will ask: <br /> <br />. How many retrofit devices are now in use? <br /> <br />· How satisfactory are the devices? <br /> <br />. Have they noticed a difference in their water bill? <br /> <br />· Have they changed any water use habits? <br /> <br />. Were they satisfied with the program implementation? <br /> <br />B. Dick Leffler is designing a spreadsheet to analyze the data we <br />obtain. This spreadsheet will be designed before water assess- <br />ments begin, so that the relevant information can be obtained <br />at that time. <br /> <br />C. A preliminary final report will be submitted to the Office of <br />Water Conservation when the retrofit installations are com- <br />plete. The report will summarize the process used in the pro- <br />gram, how well the project met its objectives, and the initial <br />project fmdings. <br /> <br />D, A final report will be submitted to the Office of Water Couser- <br />vation after the program's completion and a full season of win- <br />ter water use has been monitored. This report will include: <br /> <br />· A summary of the program objectives and implementation <br /> <br />. &timated savings per type of fixture <br /> <br />. Monthly savings for the average participant <br /> <br />. Potential savings if all Loveland residents retrofit their <br />homes <br /> <br />. Satisfaction with the devices <br /> <br />. Cost and time for installation of devices <br /> <br />. Summary of statistics related to water use <br /> <br />Page 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.