Laserfiche WebLink
<br />CIRCE Operator's Manual <br />March 1994 <br />9 <br /> <br />8.Number of EQR's on user's system <br />Single Family <br />Industrial Public <br /> <br />at buildout by user category: <br />Multi-Family ____Commercial <br /> <br />9.Month-by-month delivery pattern (from billing records) during <br />baseline year by user category in acre feet: <br /> <br />Single Fam <br /> <br />Multi-Fam <br /> <br />Comm <br /> <br />Ind Public <br /> <br />Jan <br />Feb <br />March <br />April <br />May <br />June <br />July <br />Aug <br />Sept <br />Oct <br />Nov . <br />Dec <br /> <br />lO.Description of user's water resources: <br />-Monthly yields for up to ten surface water sources <br />-water yield over 25 year study period <br />-storage size (up to two reservoir systems), starting contents <br />and monthly losses <br />-contract water (amount and conditions) <br />-ground water (monthly pumping rates for up to ten groundwater <br />sources, over 25 year study) <br /> <br />Conservation Measures <br /> <br />Toilets <br />-percentage of CURRENT customers with low flow (3.5 gallons <br />per flush) and ultra low flow, 1.6 gpf (ULF) <br />-percentage of FUTURE customers that will install ULF toilets* <br />-cost/per tap to provider for installation of ULF toilets to <br />FUTURE user. <br />-percentage of CURRENT customers that will install'ULF toilets <br />each year <br />-maximum percentage of CURRENT customers that will install ULF <br />toilets <br />-cost per fixture to provider for ulf toilet retrofit program <br />-number of toilets per EQR to be installed or replaced by user <br />category (single family, mUlti-family, commercial, industrial <br />and public) <br />