My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
North Weld County 1998 WC Plan
CWCB
>
Water Conservation
>
Backfile
>
North Weld County 1998 WC Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2011 4:06:10 PM
Creation date
9/30/2006 9:02:39 PM
Metadata
Fields
Template:
Water Conservation
Project Type
Water Conservation Plan
Project Name
North Weld County Water District Water Conservation Plan
Title
North Weld County Water District Water Conservation Plan
Date
10/26/1998
County
Weld
Water Conservation - Doc Type
Complete Plan
Document Relationships
North Weld County 1998 WCPlan Approval Ltr
(Message)
Path:
\Water Conservation\Backfile
North Weld County 1998 WCPlan Implmtn Plan
(Message)
Path:
\Water Conservation\Backfile
North Weld County 1998 WCPlan Proof of Notice
(Message)
Path:
\Water Conservation\Backfile
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />4.3.2 Future measures <br />The lmge majority ofthc District's customers arc residential, NWCWD docs not plan any <br />changes in how we deal with commercial and industrial customers other than future newsletters to <br />promote efficient water use, <br /> <br />4,4 Water re-use system. <br /> <br />4.4,1 Current measures <br />The majority ofNWCWD's customers have on-site septic systems, regulated by Weld and <br />Larimer Counties, which in operation recharges the ground water. The District also supplies water <br />to Nutri-Turf, a division of Anheuser Busch Inc., which is the wastewater applicator for the <br />Budweiser Brewmy in Ft Collins. By mixing a relatively small amount of water with the effiuent from <br />the brewing process, the resultant liquid can be applied to fields instead of inundating a sewage <br />treatment plant thus promotion of water reuse. <br /> <br />4.4.2 Future measures <br />NWCWD has no plans to require water re-use. The newsletter format may be used to relay <br />infonnation gleaned from various publications to the District's customers, <br /> <br />4.5 Distribution system. leak repair <br />4.5,1 Current measures <br />- NWCWD IIll:teIs all water into the District and all water out to customers. These monthly <br />reatlil1g.Q keep the District abreast of any major leaks. <br />- Most leaks are spotted and reported by customers and are fixed immediately, <br />- Leaks on customers side ofm.eter are reported to the customer as soon as possible. <br />- Water lines with histmy ofleaks are replaced as fimds are available, <br />- Some older, smaller lines are taken out of service as new lines are installed. <br />-ca1ls regarding low pressure and discoloration are monitored for potential problem areas. <br />4.5.2 Future measures <br />NWCWD is in theJmCCSS ofinstalling a SCADA-TELEMETRY system. which will monitor <br />various sites in the district bringing infonnation into the office which will help to detect leaks fBster. <br /> <br />4.6 Dissemination ofinfonnatioo. <br /> <br />4,6.1 Current measures <br />NWCWD currently is JWViding customer base with a 111lli!i11g encouraging voluntaIy watering <br />restrictions of mid day watering, during the summer months. <br /> <br />Page 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.