Laserfiche WebLink
<br />;- <br /> <br />. <br /> <br />. <br /> <br />EXHIBIT A <br /> <br />1. Scope of Services <br /> <br />The Project consists of the Contractor developing an effective water conservation education program for middle school children <br />and the adult community. The Contractor will build an integrated water conservation education program lhat will become part <br />of the curriculum for six, seventh, and eighth grades. The affected teachers will be shown complete and effective activities for <br />their students before they incorporate water education into lheir classes. The curriculum will be prepared such that teachers may <br />pick and choose the various activities. The Contractor will also develop an effective water conservation program and related <br />materials for customers of the Contractor. The Contractor will develop materials for use by the general public and merge this <br />program with the other water conservation plans of the Contractor such as conservation rates and pipeline leak detection. The <br />Project goals include: increasing community awareness of the effects of water conservation devices, extending the useful life of <br />the Contractor's water system, and to collecting data for evaluation of future programs. <br /> <br />The Contractor will develop a collection of 35mm photographic slides showing the use of water conservation techniques in the <br />local area. The Contractor will also develop a VHS tape showing successful water conservation techniques, organize a speaking <br />program to be used by staff and board members for public presentation, develop workshops on water conservation for the general <br />public, and design materials to be used by visitors to the water treatment facilities. The Contractor will publicize the Project <br />through the District's newsletter and the local papers. . <br /> <br />The Contractor will have on record the monthly water usage of each household. This will allow the Contractor to track usage <br />and savings, before and after the project. The Contractor will conduct a survey of the teachers utilizing the cwricu1um and the <br />customers of the Contractor. <br /> <br />A Final Report shall be compiled u~n completion of the Project. The Final Report shan include a summary of the Project, <br />discussion of the Project implementation, Project findings and water savings results. The Final Re~rt will not only conclude the <br />Project but will serve as information to be shared with other Colorado communities. <br /> <br />2. Proiect TIme of Perfonnance <br /> <br />The Project will commence on September 1, 1993 or upon fun and proper execution of this Contract. <br /> <br />The Project will be completed on or before December 1, 1994. However, the Project time of performance may be extended <br />subject to the mutual agreement of the State and Contractor. A written request for extension shall be submitted to the State by <br />the Contractor at least thirty (30) days prior to December 1, 1994, and shall include a full justification for the extension request. <br /> <br />Page I of 2 Pages <br />