My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Coors Ceramic Conservation & Reuse Study Final Report
CWCB
>
Water Conservation
>
Backfile
>
Coors Ceramic Conservation & Reuse Study Final Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2011 12:48:51 PM
Creation date
9/30/2006 9:02:15 PM
Metadata
Fields
Template:
Water Conservation
Project Type
Ag/Muni Grant
Contract/PO #
C153777
Applicant
City of Golden
Project Name
Conservation and Reuse Study for Coors Ceramic Company
Title
Water Conservation Study for Coors Ceramic Company
Date
12/12/1997
County
Jefferson
Water Conservation - Doc Type
Final Report
Document Relationships
Coors Ceramic Conservation & Reuse Study Applic
(Message)
Path:
\Water Conservation\Backfile
Coors Ceramic Conservation & Reuse Study Contract
(Message)
Path:
\Water Conservation\Backfile
Coors Ceramic Conservation & Reuse Study WorkPlan
(Message)
Path:
\Water Conservation\Backfile
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />COST SAVINGS ANALYSIS <br /> <br />COST ASSOCIATED WITH CURRENT WATER USAGE <br /> <br />Initial estimates detennined potable water use in the current flow through <br />cooling system to be approximately 750,000 gallons per month. <br /> <br />Cost per month: water rate @ $2.24 per 1,000 gallons = $1,680.00 <br />sewer rate @ $1.63 per 1,000 gallons = $1,223.00 <br />total = $2,903.00 <br /> <br />Cost per year:total = $34,836.00 <br /> <br />PROJECTED SAVINGS - WATER USAGE <br /> <br />Savings per year = $34,836.00 is approximately 15% of total annual costs for <br />water/sewer usage based on last 4 quarterly bills from the City. <br /> <br />(COST SAVINGS BASED ON CONSERVATIVE ESTIMATES) <br /> <br />COST OF NEW COOLING WATER RECIRCULATION SYSTEM <br /> <br />Water use audit and preliminary engineering design = $20,000.00 <br />($4,800.00 grant money applied toward audit costs) <br /> <br />Total coolin!: water recirculation project = $250.000.00 <br /> <br />Projected completion of project - February, 1998. <br /> <br />PROJECTED REALIZED SAVINGS <br /> <br />Within 7 years from completion of project. <br /> <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.