Laserfiche WebLink
<br />Coors Ceramics Project Timclillc <br /> <br /> <br />lt~STML UlIUTlES 08/07197 08121/97 I I <br /> --~---- - <br />RElOCA IE FIRST BLOWER 08/18/97 06120197 <br />- ---------------.. ---~--- -_..--- I -- I <br />MOVE FOUR BLOWERS FROM BASEMENT 12107/97 12/19/97 <br />. --.._-- _~__._______._n._~__~ ----- <br />DESIGN & CONTRACT PIPING NETWORK 09107197 09/15197 ::-r- I <br />----~------~- --"-- <br />PURCHASE COOLING TOWER 08107/97 08118197 <br />"_ ____ ___h_._ "._ --"--- <br />TOWER INSTALLATION 12108/97 12/11/97 I iii I <br />-------.-. ---'-- ----.-------- ------._-- ------ <br />MOVE FILTER ANO AIR COMPRESSOR 12/1~/97 12/19/97 - <br />PURCHASE PUMPS 08118197 09122/97 I" I <br />PUMP INSTALLATION 01105199 01121/98 <br />-----~ I I <br />INSTALL COOLING WATER PIPING TO MACHINES AUD KILNS 09/15/97 12118197 <br />INSTALL POWER AND CONTROLS 01105/98 01/22/98 I <br />---- I <br />INSTALL CROSS.TIES 12119197 12/28197 - <br />-------- <br />PROVE IN & BALANCE SYSTEM 01/23/98 02108198 ~ <br /> <br />Prinled: 12/03197 <br /> <br />. <br /> <br />4. <br /> <br />Milestone <br />Fixed Delay <br /> <br />6. <br /> <br />Summary <br /> <br />.ck <br /> <br />- <br />