My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CSU_Irrigation Innovation Consortium Headquarters_Application
CWCB
>
Water Plan Grants
>
Agricultural Viability Grant Fund
>
CSU_Irrigation Innovation Consortium Headquarters_Application
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2023 8:00:36 PM
Creation date
1/3/2023 4:36:24 PM
Metadata
Fields
Template:
Water Plan Grants
Basin
South Platte
Applicant
CSU
Project Description
Improving Irrigation Efficiency through the Development of Hydraluic Infrastructure at Irrigation Innovation Consortium Headquarters
Project Categories
Agricultural
Date
12/1/2020
Contract/PO #
CTGG1 2022-2096
Water Plan Grants - Doc Type
Application
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
RUBICON PICOMETER DOWNSTREAM SAND DYKE HEADGATE EACH 1 <br /> Task 6- Installation of Mainline and Manifold for Drip Irrigation System <br /> SUBSURFACE DRIP IRRIGATION RESEARCH PLOTS ACRE 7 <br /> Task 7- Demonstration and Outreach <br /> CO-PI SALARY(Inflation and Fringe included) .25 of a month/year MONTH 0.5 <br /> RESEARCH ASSISTANT 1 SALARY AND FRINGE MONTH 1.1 <br /> PI Salary (Inflation and Fringe included) .12 of a month/year MONTH 0.24 <br /> Facilities and Administration <br /> IDC required by CSU, 15%of direct costs (in-kind donation not included) EACH 1 <br /> TOTAL <br />
The URL can be used to link to this page
Your browser does not support the video tag.