My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CSU_Irrigation Innovation Consortium Headquarters_Application
CWCB
>
Water Plan Grants
>
Agricultural Viability Grant Fund
>
CSU_Irrigation Innovation Consortium Headquarters_Application
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2023 8:00:36 PM
Creation date
1/3/2023 4:36:24 PM
Metadata
Fields
Template:
Water Plan Grants
Basin
South Platte
Applicant
CSU
Project Description
Improving Irrigation Efficiency through the Development of Hydraluic Infrastructure at Irrigation Innovation Consortium Headquarters
Project Categories
Agricultural
Date
12/1/2020
Contract/PO #
CTGG1 2022-2096
Water Plan Grants - Doc Type
Application
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
COLORADO <br /> Colorado Water <br /> Conservation Board <br /> Department of Natural Resources <br /> Colorado Water • <br /> Water Plan Grant - Detailed Budg <br /> Fair and Reasonable Estir <br /> Prepared Date: 11/12/20 <br /> Name of Applicant: Colorado State University <br /> Name of Water Project: Improving irrigation efficiency through the development of the hydraulic in <br /> EXAMPLE C: Construction <br /> Task 1- Electrical Installation <br /> Sub-task Unit Quantity <br /> ELECTRICAL POWER(PER CSU COST ESTIMATE) PLUS$20K FOR PIVOT EACH 1 <br /> 4-INCH ELECTRICAL CONDUIT W/ PULL BOXES LINEAR FOOT 1300 <br /> DESIGN REVISIONS(ELECTRICAL POWER& IRRIGATION) EACH 1 <br /> Task 2- Mainline and Booster Pump Installation <br /> POC AT WELL: 8-INCH CONNECTION, PIPING OVER DITCH LS 1 <br /> BOOSTER PUMP MOUNTED ON CONCRETE PAD EACH 1 <br /> WINTERIZATION ASSEMBLY EACH 1 <br /> FILTRATION ASSEMBLY EACH 1 <br /> 6-INCH ISOLATION GATE VALVE ASSEMBLY EACH 3 <br /> 4-INCH ISOLATION GATE VALVE ASSEMBLY EACH 1 <br /> 1-INCH ISOLATION GATE VALVE ASSEMBLY EACH 2 <br /> AIR VACUUM RELIEF VALVE ASSEMBLY EACH 5 <br /> QUICK COUPLING VALVE ASSEMBLY EACH 6 <br /> 1-INCH PIPE AND WIRE SLEEVING AND PULL BOXES LINEAR FOOT 1120 <br /> 4-INCH DI PIPE FOR DITCH CROSSING LINEAR FOOT 100 <br /> 6-INCH MAINLINE PIPE LINEAR FOOT 2500 <br /> Task 3- Establishment of grass reference crop ETo plot <br /> TURF RESEARCH: 1-INCH PVC LATERAL PIPE LINEAR FOOT 4500 <br /> TURF RESEARCH: 1-INCH RCV ASSEMBLY WITH FLOW SENSOR EACH 18 <br /> TURF RESEARCH: ROTARY SPRINKLERS INSTALL W/ FLEX PIPE EACH 64 <br /> TURF CONTROLLER ON STRUT SYSTEM EACH 1 <br /> BLOW OUT ASSEMBLY EACH 2 <br /> TURF RESEARCH: SUBSURFACE DRIP IRRIGATION EACH 1 <br /> Task 4- Installation of Mainline and Concrete Pad for VRI Pivot <br /> VRI PIVOT- PAD,POC, AVR EACH 1 <br /> Task 5- Installation of Automated Head Gate and Turnout Gate <br /> RUBICON FLUME GATE RETROFIT AT EXISTING CHECK STRUCTURE EACH 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.