My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153320 Quit Claim Deed
CWCB
>
Loan Projects
>
DayForward
>
7001-8000
>
C153320 Quit Claim Deed
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2018 1:56:23 PM
Creation date
11/6/2018 1:56:18 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153320
Contractor Name
Beaver Park Water, Inc.
Contract Type
Loan
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
fl <br /> i <br /> • PROMISSORY NOTE <br /> Date: September 13, 2011 <br /> Borrower: Beaver Park Water, Inc. <br /> Principal Amount: $1,500,000* <br /> Interest Rate: 3% per annum <br /> u -_41. Term of Repayment: 40 years <br /> Loan Contract No.: C153320, dated September 1, 1981 and amended <br /> p <br /> . September 13, 2011 <br /> Loan Payment: $64,890.00 <br /> First Payment Date**: January 1, 1981 <br /> Maturity Date**: April 1, 2021 <br /> o * The remaining principal balance as of 6/30/2011 is $553,534.48. <br /> * * The repayment schedule totals more than 40 years because of a deferred payment in <br /> � 1991. <br /> 1. FOR VALUE RECEIVED, the BORROWER promises to pay the Colorado Water <br /> Conservation Board ("CWCB"), the Principal Amount plus Interest for the Term of <br /> Repayment, pursuant to the LOAN CONTRACT and this promissory note. <br /> 2. This Promissory Note replaces and superseNhe s ote provision A.8 of <br /> ' ,-Q, the Original Contract dated December 1`5, 19 i e, CrlOal amount of <br /> $1,500,000. <br /> 3. Principal and interest shall be payable in equal Loan Payments, with the first payment <br /> due and payable on the First Payment Date, and annually thereafter. All principal, <br /> interest, and late charges, if any, then remaining unpaid shall be due and payable on <br /> or before the Maturity Date. <br /> 4 4. Payments shall be made to the Colorado Water Conservation Board at 1313 Sherman <br /> Street, Room 721, Denver, Colorado 80203. <br /> 5. The CWCB may impose a late charge in the amount of 5% of the annual payment if <br /> the CWCB does not receive the annual payment within 15 calendar days of the due <br /> date. <br />\liN 6. This Note may be prepaid in whole or in part at any time without premium or penalty. <br /> Any partial prepayment shall not postpone the due date of any subsequent payments <br /> or change the amount of such payments. <br /> N 7. All payments received shall be applied first to late charges, if any, next to accrued <br /> 4 interest and then to reduce the principal amount. <br /> Appendix B to Loan Contract C153320 <br /> • 'y <br /> i <br /> C ) <br />
The URL can be used to link to this page
Your browser does not support the video tag.