My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150333 PIF
CWCB
>
Loan Projects
>
DayForward
>
7001-8000
>
C150333 PIF
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/20/2018 12:42:20 PM
Creation date
7/20/2018 12:41:55 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150333
Contractor Name
Montezuma Valley Irrigation Company
Contract Type
Loan
Loan Projects - Doc Type
Repayment Information
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
The Dolores Water Conservancy District, a Colorado quasi-municipal corporation <br /> ("DWCD"), has two agreements with the Borrower (MVIC), under which the Borrower <br /> has repayment obligations to DWCD secured by a first lien on the Borrower's <br /> assessment revenues. These Agreements include the "Contract between DWCD and <br /> MVIC for Adjustment of Water Rights and Sale of the Use of Irrigation Water, Dolores <br /> Project, Colorado River Storage Project" (Articles 4, 6, 7 and 8), and the "Contract <br /> Among the United States and DWCD, MVIC and the Ute Mountain Ute Tribe <br /> Providing for the Adjustment of Water Rights and for the Rehabilitation, Operation, <br /> Maintenance and Replacement of Facilities to Reduce Salinity Inflow to Colorado <br /> River" (Articles 5 and 6). <br /> SECTION 6-COLLATERAL <br /> In addition to the property pledged in paragraph 8 of the loan contract, the collateral <br /> provided for this loan, as evidenced by the executed Deed of Trust, in the form <br /> attached as Appendix 5 and incorporated herein, shall be the May Pipeline, as more <br /> particularly described in the attached Deed of Trust ("Collateral"). <br /> SECTION 7—ADDITIONAL CONDITIONS&CONTRACT REQUIREMENTS <br /> A. Prior to disbursement of loan funds, the CWCB shall receive a parity position with <br /> the Dolores Water Conservancy District on the Company's assessment revenues <br /> for the new debt added by this loan. <br /> B. Any funds received by the Borrower from the Bureau of Reclamation related to the <br /> water accounting system shall be given to the CWCB and will be applied to the <br /> outstanding principal loan balance, and the loan contract shall be amended to the <br /> reduced loan amount. <br /> SECTION 8—CONSTRUCTION FUND PROGRAM PROCEDURES <br /> A. The BORROWER shall employ an engineer, registe .Colorado to <br /> prepare plans and specifications for the PROJtcT. <br /> B. The BORROWER'S and the Engineering Cons It is Agreements-and the plans and <br /> specifications must be submitted to the C, a f.',;:-:--, --'s- of.-y pliance <br /> with the terms of this Contract when availabl bi' • od ations to <br /> the plans and specifications must be approve in wri ng ., the u. <br /> C. For plans and specifications for all jurisdictional dams and reservoirs, as defined by <br /> § 37-87-105 C.R.S., the BORROWER shall provide a letter of approval from the State <br /> Engineer's Office prior to construction. <br /> D. CWCB staff must be present at bid opening and must approve the award of the <br /> construction contract. <br /> E. The BORROWER shall contract for the construction of the work with responsible and <br /> capable Construction Firms, which said Construction Firms shall be selected by the <br /> BORROWER and found acceptable by the CWCB staff. <br /> Appendix 1 to Loan Contract C150333 <br /> Page 2 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.