My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150333 PIF
CWCB
>
Loan Projects
>
DayForward
>
7001-8000
>
C150333 PIF
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/20/2018 12:42:20 PM
Creation date
7/20/2018 12:41:55 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150333
Contractor Name
Montezuma Valley Irrigation Company
Contract Type
Loan
Loan Projects - Doc Type
Repayment Information
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
F. The BORROWER must provide a copy of the executed construction contract <br /> documents consisting of the contractor's proposal, construction contract, <br /> performance bond, payment bond, notice of award, notice to proceed, sample <br /> change order, and sample field order, as well as the advertisement for bid and bid <br /> bond at bidding. After the CWCB staff verifies that these documents comply with the <br /> terms of this contract, the BORROWER may issue the notice to proceed to the <br /> Construction Firms. <br /> G. The BORROWER shall conduct a pre-construction conference at which time the <br /> CWCB staff shall have the opportunity to review and approve the construction <br /> schedule. <br /> H. If the CWCB staff determines that the PROJECT requires a resident inspector during <br /> construction, the BORROWER shall employ an inspector who has been approved by <br /> the CWCB staff. <br /> I. The BORROWER shall construct the PROJECT in accordance with the approved plans <br /> and specifications. <br /> J. Upon completion of the PROJECT construction, the BORROWER shall provide as-built <br /> drawings of the PROJECT to the CWCB staff, or, if required by § 37-87-105, C.R.S., <br /> the BORROWER shall provide the as-built drawings to the State Engineer's Office for <br /> approval and filing. <br /> K. Upon completion of the PROJECT construction, the BORROWER shall arrange a final <br /> inspection for the CWCB staff. <br /> L. The BORROWER shall pay all of the expenses related to the PROJECT when such bills <br /> are due. <br /> SECTION 9—ELIGIBLE EXPENSES. The following items are eligible for loan disbursements. <br /> A. Preparing final designs and specifications for the PROJECT. <br /> B. Preparing bid and construction contract documents. . <br /> C. Preparing environmental assessment or environpiental p e 9 , and <br /> otherwise complying with the Federal National Envrronmen a oh ' t'. <br /> D. Complying with all federal, state, and local regul it ii .•in• e <br /> obtaining of all required permits. <br /> E. Fish and wildlife mitigation measures required by e a , st o . - - <br /> regulations. <br /> F. Actual construction as called for in the design documents and in change orders <br /> approved by the CWCB and the BORROWER. <br /> G. Engineering services for construction management, including design and <br /> construction management for CWCB-approved change orders. <br /> H. Interest during completion of the PROJECT pursuant to Paragraph A.4 of the <br /> Contract. <br /> I. Legal services for reviewing engineering services contracts, reviewing this Contract, <br /> reviewing construction contract documents, and for complying with all federal, state, <br /> Appendix 1 to Loan Contract C150333 <br /> Page 3 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.