1.2 Meet with the District, the Town and CWCB at a half -day Project Initiation <br />Meeting to review the draft Project Work Plan and proposed mobilization activities; <br />and, tour Town plant site. Prepare Project Initiation Meeting notes and final Project <br />Work Plan incorporating review comments and submit twenty (20) paper copies and <br />one electronic copy to the District for distribution to District staff, the Town and <br />CWCB. <br />1.3 Detailed pilot plant equipment operational requirements will be described in the <br />equipment vendors Operations and Maintenance manuals. <br />2.0 Task 2—Design Pilot Testing and Ancillary Equipment Installation <br />2.1 Prepare equipment list and layout drawings; process flow diagrams showing all <br />tanks, pumps and inline instruments; interconnecting piping schematics; connection <br />with system control and data acquisition system; and, electrical and instrumentation <br />wiring diagrams for installation of pilot testing and ancillary equipment for each ZLD <br />process. Equipment and ancillary components will be installed in trailers or cargo <br />containers. The District will acquire the use of an existing HRROP semi -trailer and <br />will provide a temporary trailer for installation of the VSEP equipment. The Town <br />will make available a suitable power supply sub -feed connection at their Membrane <br />Water Treatment Plant main distribution panel; the District will provide electrical <br />cable and local disconnects for each trailer. Ten (10) paper sets of preliminary <br />construction and equipment installation drawings will be submitted to the District and <br />the Town for review. <br />2.2 Identify building permits that may be required for pilot plant installation and work <br />with the Town to obtain necessary permits <br />2.3 Meet with the District and the Town to review preliminary pilot plant construction <br />and equipment installation drawings and obtain approvals. Incorporate review <br />comments and submit Ten (10) paper sets and one electronic set of final construction <br />and equipment installation drawings to the District, the Town and CWCB. <br />3.0 Task 3- Procure and Install Pilot Plant Equipment <br />3.1 Prepare and issue equipment rental/supply (including service technician time and <br />expenses) agreements to vendors for the VSEP pilot equipment, RO spiral wound <br />membranes, 2 gallon per hour spray dryer, temporary trailer, HRROP pilot plant <br />equipment and the miscellaneous ancillary components needed for the pilot testing <br />systems. The Districtwill coordinate delivery of trailers and equipment cargo <br />containers to the site with the Town and the District. As the equipment is delivered <br />to the site, the District will begin installation. <br />ECCV_ScopeOfWork.doc 2 <br />