My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Metro - ECCV Zero Liquid Discharge Pilot Study_Contract
CWCB
>
WSRF Grant & Loan Information
>
Backfile
>
Metro - ECCV Zero Liquid Discharge Pilot Study_Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/4/2020 2:03:20 AM
Creation date
12/7/2017 12:40:21 PM
Metadata
Fields
Template:
WSRA Grant and Loan Information
Basin Roundtable
Metro
Applicant
East Cherry Creek Valley Water & Sanitation District
Description
Zero Liquid Discharge Pilot Study
Account Source
Basin & Statewide
Board Meeting Date
9/19/2007
Contract/PO #
C150412
WSRA - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXHIBIT A <br />SCOPE OF SERVICES <br />Professional Services <br />Membrane Treatment Concentrate Zero Liquid Discharge Pilot Plant Study <br />WATER ACTIVITY NAME - Zero Liquid Discharge Pilot Study <br />GRANT RECIPIENT — East Cherry Creek Valley Water and Sanitation District <br />FUNDING SOURCE - WSRA Statewide Account ($200,000) and Metro Basin Account <br />($200,000) <br />BACKGROUND <br />This is an Exhibit attached to and made a part of the Agreement between EAST <br />CHERRY CREEK VALLEY WATER AND SANITATION DISTRICT (District) and <br />Colorado Water Conservation Board. (CWCB)for professional services to conduct a zero <br />liquid discharge (ZLD) pilot plant study to examine technologies for treatment of <br />membrane water treatment plant concentrate (Project). The study will utilize <br />commercially available equipment to evaluate two ZLD technologies —Vibratory Shear <br />Extraction Process (VSEP) and High Recovery Reverse Osmosis Process (HRROP). <br />Concentrate from the Town of Lochbuie (Town) Colorado existing Membrane Water <br />Treatment plant will be utilized as source water for the pilot studies. The District will <br />work with the Town to site temporary facilities to house pilot plant equipment and <br />provide necessary utilities to support equipment operation and testing. <br />The study is being funded by a grant from the Colorado Water Conservation Board <br />(CWCB) to the District, District funds and a grant from the South Metro Water Supply <br />Authority. <br />SUMMARY OF TASKS <br />The Scope of Services of the District as follows: <br />1.0 Task 1 — Prepare Work Plan <br />1.1 Prepare a draft Project Work Plan describing pilot study objectives, performance <br />objectives and testing scenarios; equipment testing protocols and associated test <br />parameters, general site layout, operational and utility requirements, and procurement <br />approach; pilot plant staff activities during the six months of on -site testing; overall <br />Project schedule; communication and coordination with the Town; health and safety <br />requirements; and, project documentation and progress reporting. Ten (10) paper <br />copies and one electronic copy of the draft Work Plan will be submitted to the <br />District for review and distribution to the Town and CWCB. <br />ECC V_ScopeOfWork.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.