Laserfiche WebLink
June 4,2009 <br /> NRCS specifications follow: <br /> Cozastrazetiozi< Speeificatiozi 4-47hanuel Clearilta <br /> Azad Suaplmg <br /> 1. Scope <br /> The work consists of clearing designated areas by the removal and disposal of trees,logs,stumps. <br /> shrubs,brush,and rubbish,and the shaping of the charuiel. <br /> 3. Protection of existing vegetation <br /> Trees and other vegetation designated to remain undiAttrbed shall be protected from damage through- <br /> out the duration of the construction period.ku y damages resulting from the contractor's operations or <br /> neglect stall be repaired by the contractor. <br /> Earihfill,stockpiling of materials,vehicle or equipment parking.and excessive foot or vehicle traffic <br /> shall not he allowed within the drip lute of vegetation designated to remain in place.vegetation damapM <br /> by any of these or similar actions shall be replaced with viable vegetation of the same species,sintihtr <br /> condition.and like size tmless otherwise approved by the contracting officer. <br /> Any cute skims,scrapes,or bruses to the bark of the vegetation shall be carefully trimmed and local <br /> nursery accepted procedures used to seal damaged bark. <br /> Any limbs or branches 0.5 inch or larger in diameter that are broken,severed,or otherwise seriously <br /> damaged during construction shall be cut off at the base of the darnaged limb or branch flush with the <br /> adjacent limb or tree tnmk. <br /> All roots 1 inch or larger in diameter that are cut,broken,or othem-ise severed during channel shaping <br /> shall have the end smoothly cut perpendicular to the root-.Roots exposed during cliamtel shaping opera- <br /> tions shall be covered with moist,soil as soon as possible to prevent roots from drying out, <br /> 3. Marking <br /> The linuts of the area(s)to be cleared and shaped are marked by stakes,flags.paint,tree markings,or <br /> other suitable methods or as specified in section 8 of this specification,or they will be showzu on the <br /> drawings.Trees to remain standing,midisturbed,and uninjured are designated by special markings. <br /> I <br /> 4. Clearing <br /> Trees and other vegetation marked for clearing shall be cut off as near the grotuud surface as conven- <br /> tional tools and equipment normally permit,All trees not marked for preservation and all snags.logs, <br /> brush,shrubs,stumps,and rubbish shall be cleared from within the area lints identified <br /> S. Disposal <br /> All woody material,vegetation.and rubbish resulting from clearing from designated areas shall be dis- <br /> posed of at the locations and in a manner shown on the drawings,or as specified in section 8 of this <br /> specification. <br /> 6. Shaping <br /> The channel bottom and side slopes shall be shaped as shown on the drawings.The resulting shaped <br /> channel surface shall be reasonably smooth.Material excavated during the chtatutel shaping operation <br /> shall be removed from the chamwl and disposed of as specified in section 8 of this specification. <br /> (210-[1-NER May 2001) 1-1 <br /> Deliverable—This work was completed according to Phase I in Project proposal. Achieved a <br /> stable channel, and restored natural shape of main channel in preparation for next task. <br /> El Codo Ditch Company 3 Updated Statement of Work <br />