Laserfiche WebLink
y <br /> Plan of Study-Greeley and Loveland Irrigation System Rehabilitation Feasibility Study Page 7 <br /> ESTIMATED COST <br /> The summary of the estimated task costs are shown in the following table: <br /> Task No. Description Estimated <br /> Cost <br /> 1 Data Collection $8,120 <br /> 2 Hydrologic Analysis 4,560 <br /> 3 Existing Facilities Evaluation 7,120 <br /> 4 Alternative Development 19,240 <br /> 5 Alternative Evaluation 8,120 <br /> 6 Financial Analysis 2,048 <br /> 7 Study Report 7,720 <br /> 8 Coordination Meetings 3,120 <br /> Subtotal Salary Costs $60,048 <br /> Subtotal Direct Costs <br /> (Telephone,Reproduction,Mileage,Postage,Software-CanalMan $1,725 <br /> (Client Copy)) <br /> Subconsultants <br /> Surveying $3,000 <br /> Environmental-ERO $2,000 <br /> TOTAL PROJECT COST $66,773 <br /> I <br /> F <br /> i <br /> F:\PROJECTS\GREELE-1\CWCB\GRELOV.PRO <br /> E <br />