My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150360 Amend 1
CWCB
>
Loan Projects
>
DayForward
>
5001-6000
>
C150360 Amend 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2017 11:14:21 AM
Creation date
8/30/2017 11:13:49 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150360 CT2015-141
Contractor Name
East Mesa Water Company
Contract Type
Loan
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SECTION 5 — SCHEDULE OF EXISTING DEBT <br />No other debt, backed by Company's assessment revenues, exists. <br />SECTION 6 - COLLATERAL <br />The COLLATERAL provided for this loan, as evidenced by the executed SECURITY <br />AGREEMENT (Appendix 4) and DEED OF TRUST (APPENDIX 5) and incorporated herein, <br />shall be a pledge of assessment revenues and an undivided one hundred percent <br />(100%) interest in the PROJECT, which consists of up to 1,450 feet of 48 -inch high <br />density polyethylene (HDPE) pipe as more particularly described in the attached DEED <br />OF TRUST ("COLLATERAL"). <br />SECTION 7 — ADDITIONAL CONDITIONS & CONTRACT REQUIREMENTS <br />a) The contract with NRCS shall be executed by the East Mesa Water Company <br />prior to disbursal of CWCB loan funds. <br />b) Within thirty (30) working days after receipt of the reimbursement from the NRCS, <br />the BORROWER shall submit to the CWCB an amount equal to the reimbursement. <br />The NRCS reimbursement, or any other grants or funds (excluding regular Loan <br />Payments under the PROMISSORY NOTE) finds obtained by the BORROWER and paid <br />to CWCB, will be applied to the outstanding principal loan balance, and the LOAN <br />CONTRACT shall be amended to the reduced loan amount. <br />SECTION 8 — CONSTRUCTION FUND PROGRAM PROCEDURES <br />A. The BORROWER shall employ an engineer, registered in the state of Colorado to <br />prepare plans and specifications for the PROJECT. <br />B. Engineering contracts and the plans and specifications must be submitted to the <br />CWCB staff for verification of compliance with the terms of this CONTRACT when <br />available prior to bidding. Any modifications to the plans and specifications must be <br />approved in writing by the CWCB staff. <br />C. For plans and specifications for all jurisdictional dams and reservoirs, as defined by <br />§ 37-87-105 C.R.S., the BORROWER shall provide a letter of approval from the State <br />Engineer's Office prior to construction. <br />D. The BORROWER shall extend an invitation to CWCB to be present at the bid opening. <br />E. The BORROWER shall contract for the construction of the work with responsible and <br />capable Construction Firms, which said Construction Firms shall be selected by the <br />BORROWER and found acceptable by the CWCB staff. <br />F. The BORROWER must provide a copy of the executed construction contract <br />documents consisting of the contractor's proposal, construction contract, <br />performance bond, payment bond, notice of award, notice to proceed, sample <br />change order, and sample field order, as well as the advertisement for bid and bid <br />bond at bidding. After the CWCB staff verifies that these documents comply with <br />Appendix 1 to Loan Contract C150360 <br />Page 2 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.