Laserfiche WebLink
PROJECT SUMMARY— EAST MESA WATER COMPANY <br />CONTRACT No. C150360 <br />SECTION 1 —BORROWER INFORMATION <br />Name: East Mesa Water Company, a Colorado nonprofit corporation <br />Address: 1664 Prince Creek Road, Carbondale, Colorado 81623 <br />Contact: Marty Nieslanik <br />Phone Number: 970-948-3587 <br />E-mail address: niesianikbeef@gmail.com <br />Type of Entity: Colorado nonprofit corporation <br />Section 2 — Project Description <br />A. Description of PROJECT: The BORROWER applied to the CWCB for a loan to be <br />used to install a high density polyethylene pipe in the existing ditch and rehabilitate <br />the existing tunnel ("PROJECT"), to remove the threat of tunnel collapse and insure <br />the delivery of irrigation water to its ranching shareholders. The PROJECT is located <br />the Crystal River Valley in the northern portion of Pitkin County and the southern <br />portion of Garfield County, Colorado. The estimated PROJECT cost is $550,000. <br />B. Description of Feasibility Study: The CWCB has reviewed a feasibility study report <br />dated May 1, 2013 on the PROJECT. The feasibility study, titled "Feasibility of Piping <br />a Section of the East Mesa Water Company" prepared by Dennis Davidson. The <br />study includes a preliminary engineering design and construction cost estimates <br />prepared by Mike Kishimoto, NRCS, Garfield County Office and is incorporated <br />herein by reference. The study was prepared in accordance with the CWCB <br />guidelines. Based upon the feasibility report, the CWCB determined the PROJECT to <br />be technically and financially feasible. <br />C. SECTION 3 — CWCB'S AUTHORITY <br />Construction Fund: This loan is made pursuant to the provisions of §§ 37-60-119 and <br />37-60-120, C.R.S., which authorize the CWCB to loan money for water projects from <br />the CWCB Construction Fund for the benefit of the people of the state, provided that <br />the borrower assures repayment of that money. <br />Section 37-60-122(1)(b), C.R.S., authorizes the CWCB to make loans of up to <br />$10,000,000 from the CWCB's Construction Fund and the State Severance Tax Trust <br />Fund Perpetual Base Account Fund without prior approval from the General <br />Assembly. <br />SECTION 4 - BOARD APPROVAL <br />At its July 2013 meeting, the CWCB approved a Small Project Loan from the <br />Construction Fund to the BORROWER in an amount up to $550,000 for PROJECT costs, <br />with $5,500 for the loan origination fee of 1 % of the cost of the PROJECT, in accordance <br />with CWCB Policy No. 16, resulting in a total loan amount of $555,500 at an interest <br />rate of 1.75% per annum for a repayment term of 30 years. <br />Appendix 1 to Loan Contract C150360 <br />Page 1 of 4 <br />