My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CT2017-3641 Approval Letter
CWCB
>
Loan Projects
>
DayForward
>
6001-7000
>
CT2017-3641 Approval Letter
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2017 11:46:51 AM
Creation date
3/24/2017 12:37:58 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2017-3641
Contractor Name
North Poudre Irrigation Company
Contract Type
Loan
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
North Poudre Irrigation Company Agenda Item 28a <br /> March 22-23, 2017 Board Meeting(Updated March 23, 2017) <br /> Page 4 of 6 <br /> placement of a mud mat, installation of 130 lineal feet of concrete-encased steel pipe, <br /> construction of a new outlet structure, and installation of a cutoff trench and sand collar, all at <br /> an increased cost of approximately $80,000. A camera inspection of the outlet conduit revealed <br /> no structural deficiencies in the conduit downstream of the repair area and there have been no <br /> operational issues with outlet structure; thus, the CIPP alternative was selected. <br /> TABLE 2: ESTIMATED PROJECT COSTS <br /> Task Cost <br /> Design $89,110 <br /> Construction $356,400 <br /> Contingency (10%) $49,490 <br /> Total $495,000 <br /> Permitting: The Company has full access to the project area under existing easements. No <br /> permits or additional easements are required to complete the project. <br /> Schedule: A final design will be developed, followed by a standard bid process. Construction is planned <br /> for fall of 2017, with completion targeted prior to the spring 2018 irrigation season. <br /> Financial Analysis <br /> Table 3 provides a summary of the Project's financial aspects. The term of the loan will be 30 years with <br /> a blended interest rate of 2.50%, reflecting the Company's share ownership distributed amongst 26% <br /> agriculture, 73% municipal middle income, and 1% commercial interests. <br /> TABLE 3: FINANCIAL SUMMARY <br /> Total Project Cost $ 495,000 <br /> CWCB Loan Amount (100%) $ 495,000 <br /> CWCB Loan Amount (Including 1% Service Fee) $ 499,950 <br /> CWCB Annual Loan Payment $ 23,886 <br /> CWCB Annual Loan Obligation (including reserve requirement) $ 26,275 <br /> Annual Loan Obligation per share (10,000 Shares) $ 2.63 <br /> Current Assessment per share $ 210 <br /> Future Assessment per share $ 210 <br /> Project cost per acre-foot deliveries (600 acre-feet) $ 833 <br /> Project cost per AF recovered (264 AF) $ 1,894 <br />
The URL can be used to link to this page
Your browser does not support the video tag.